Similar Projects
Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

Z--Construction IDIQ 2020 - Ohio - MEP
Design
$20,000 to $16,000,000 est. value
Chillicothe, Cleveland, OH

UC ECUP Boilers 2 and 3
Alteration
Bidding
Less than $1,000,000 est. value
Columbus, OH 43224

Administration Building Boiler Replacement Design/Build
Alteration
Bidding
$250,000 est. value
Akron, OH 44308

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

Replace Fan Coil Units Building 7 Sinclair Community College
Post-Bid
Less than $130,000 est. value
Centerville, OH

Y--1B229 Mechanical Room (VA-19-00027342)
Results
$250,000 to $500,000 est. value
Cleveland, OH 44106

Stokes Mall Boiler Replacement
Results
$225,000 to $350,000 est. value
OH

Chiller Repairs at Wright-Patterson Air Force Base
Design
$5,000,000 to $10,000,000 est. value
Wright Patterson Air Force Base, OH

Mechanical Contractors and Electrical Contractors - Upgrades to Mechanical Systems
Alteration
Bidding
Warren, OH 44483

Boiler and AHU Replacement Lima Fire Department
Post-Bid
Lima, OH

Terminal Boiler Replacement
Results
Cleveland, OH 44135

2021 Annual Conflict Monitor Testing
Alteration
Bidding
Less than $5,000 est. value
Centerville, OH

Replacement of (2) DW Gas-Fired Heating Boilers, (2) Heat Exchanger Pumps and (2) Storage Tanks at The Pincrest Apartment
Post-Bid
Cincinnati, OH 45200

Energy Center Boiler Controls
Results
Less than $270,000 est. value
Akron, OH 44325

Last Updated 06/18/2021 09:22 AM
Project Title

Installing and Setting Up Freezers and Milk Coolers

Physical Address View project details and contacts
City, State (County) Akron, OH   (Summit County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing, delivering to each specified location, unpacking and setting up/installing/turning on thirteen (13) True T-49F (or equivalent*) Stand-alone Reach In Freezers and three (3) True TMC-58-DS-HC (or equivalent*) Stand-alone Milk Coolers, and removing all packing materials/boxes.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Coolers, Walk-In Freezers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents