Similar Projects
6 and 10 Ton HVAC
Bidding
Bryan, TX 77807

6 and 10 Ton HVAC
Bidding
Bryan, TX 77807

Evans Library Annex Entry HVAC
Post-Bid
College Station, TX 77843

Texas Vet Med Diagnostic Lab Renovation of HVAC
Post-Bid
College Station, TX 77845

Re-Insulation of UES Chillers
Results
Less than $23,360 est. value
College Station, TX 77845

CUP HHW Heat Exchanger 004 Replacement
Results
Less than $274,170 est. value
College Station, TX 77843

Texas A&M Dunn HVAC Replacement
Construction
College Station, TX 77840

Commercial Heating, Ventelation and Air Conditioning (HVAC) Maintenance and Repair
Term Contract
Post-Bid
Bryan, TX 77803

Cooling Tower Repairs
Results
Bryan, TX 77807

HVAC and Mechanical Products
Term Contract
Post-Bid

Weatherization Services, HVAC and Construction
Results
Bryan, TX 77802

Wellfield Pump Station Cooling Tower Repairs
Results
Less than $46,825 est. value
College Station, TX 77845

Hhwhhx004 Heat Exchanger Installation
Results
Less than $484,000 est. value
College Station, TX 563555

Design Build Services for SECO LoneStar Project
Results
Bryan, TX 77803

Wells Hall HVAC Replacement
Results
College Station, TX 77840

Last Updated 07/01/2020 09:21 AM
Project Title

Installation of Vehicle Exhaust Removal Systems at Fire Stations 1, 2, and 4

Physical Address View project details and contacts
City, State (County) College Station, TX 77845   (Brazos County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $168,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the installation of vehicle exhaust removal systems at three (3) City of College Station Fire Stations. This is a federally funded project via a grant awarded by the Federal Emergency Management Agency (FEMA) which is an agency within the Department of Homeland Security (DHS). Fire Station 1: 304 Holleman Drive East 1 back-in bay, 2 drive-through bays 3 vehicles currently housed at this station Fire Station 2: 2200 Rio Grande Boulevard 4 back-in bays 4 vehicles currently house at this station Fire Station 4: 1550 George Bush Drive West 3 drive-through bays 4 vehicles currently housed at this station, 2 back-in and 2 drive-through

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents