Similar Projects
Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

Repurpose Hatfield Elementary School for Centralized Administrative Use
Renovation
Conception
$18,400,000 est. value
Justin, TX 76247

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

Seven Hills Replacement & Molly Livengood Carter ES
New Construction
Bidding
$61,000,000 est. value
Fort Worth, TX

Construction Manager at Risk for Pre-K Additions
Renovation
Bidding
Justin, TX

McClendon Park West
Renovation
Sub-Bidding
$1,500,000 est. value
Mansfield, TX 76063

Gertie Barrett Park
Alteration
Sub-Bidding
$1,500,000 est. value
Mansfield, TX 76063

Keller ISD - New Parkview & Whitley Road Elementary Schools
Post-Bid
Keller, TX

Rosemont Schools Bathroom Renovation - 2 Schools
Renovation
Post-Bid
Less than $1,202,500 est. value
Fort Worth, TX 76110

Toughman Course
Results
Fort Worth, TX 76119

Town of Ponder - Sports Complex
Results
$5,168,850 est. value
Ponder, TX 76259

Uplift Education Cooks Lane Primary School
New Construction - 62,000 SF
Construction
$12,000,000 est. value
Fort Worth, TX 76120

Uplift Education Elevate Primary School
New Construction - 86,000 SF
Construction
$16,000,000 est. value
Fort Worth, TX 76108

Davis Elementary School Improvements
Renovation
Pending Verification
Carrollton, TX 75007

Reported 02/18/2022 12:00 AM
Project Title

Design Build for Elementary School Playgrounds

Physical Address View project details and contacts
City, State (County) Fort Worth, Haslet, Trophy Club, TX 76131 (Denton, Tarrant Counties)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Park/Playground
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Design and Build of various playgrounds at Northwest ISD Elementary Campuses. Each elementary school campus currently has an upper playground and a lower playground. Upgrades will include integrating new equipment to the existing playgrounds and resurfacing.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents