Similar Projects
Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

2018 Sewer Point Repair and Improvements
Results
$1,000,000 to $5,000,000 est. value
Clearwater, FL 33755

McMullen Booth Road and SR 580 Water Main Improvements
Results
Less than $1,435,166 est. value
FL

Grease Waste Piping Renovations
Post-Bid
Less than $200,000 est. value
Clearwater, FL 33759

Service Line Warranty Program - Utilities - Co-Op
Term Contract
Results
FL

J--Grease Trap Cleaning Service
Results
Bay Pines, FL 33744

102nd Avenue and Bryan Dairy Road Sewer Lining Project
Results
Less than $812,614 est. value
FL

North Bayshore Sanitary Sewer and Force Main Replacement Project
Results
Less than $1,490,000 est. value
Safety Harbor, FL

San Pipe Repair and Replace FY19
Term Contract
Results
$3,049,000 est. value
Saint Petersburg, FL 33700

San Priority Area Repair and Replace
Results
$3,600,000 est. value
Saint Petersburg, FL

San HDPE Pipe Replacement
Term Contract
Results
$3,600,000 est. value
Saint Petersburg, FL

Construction of Harbor Palms Infrastructure Project Phase 1
Results
Less than $5,760,000 est. value
Oldsmar, FL

Pump Station 016\Park Boulevard Force Main to South Cross Bayou Replacement
Results
Less than $16,745,920 est. value
Pinellas Park, FL 33781

Sewer Interceptor Rehabilitation - 94th Avenue to 86th Avenue and 86th Avenue to Pump Station 069
Results
Less than $1,218,025 est. value
FL

Reported 01/30/2019 12:00 AM
Project Title

Sugar Bear Drive Sanitary Sewer Pipe Repairs and Scott Street Utility Repairs

Physical Address View project details and contacts
City, State (County) Safety Harbor, FL   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Sugar Bear Drive Sanitary Sewer Pipe Repairs, includes in general, but is not limited to the following work:removal of gravity sanitary sewer main, abandon & grout exist. sanitary sewer manhole, install sanitary sewer manhole,install 8" gravity sewer pipe and laterals, manhole liner system and pavement milling and restoration, sodding and painting of concrete surfaces. Scott Street Utility Repairs, includes in general, but is not limited to the following work: removal of gravity sanitary sewer mains, installing 8" PVC SDR-26 gravity sewer pipe and 8" DIP gravity sewer pipe, installing 30" RCP storm sewer, mondifications to existing storm sewer manhole, installing conflict structure, milling & resurfacing of asphalt,CIPP liner for 8" sanitary pipe, sodding and MOT. The estimated cost for Sugar Bear Drive Sanitary Sewer Pipe Repairs is $ 264,290.00. The estimated cost for Scott Street Utility Repairs is $ 244,275.00
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents