Similar Projects
Residential and Commercial Solid Waste Collection Services
Term Contract
Bidding
Pompano Beach, FL

Disaster Debris Monitoring Services
Term Contract
Post-Bid
Coral Springs, FL

Removal of Sediment and Debris from Culvert Pipes at five (5) locations
Post-Bid
Coral Springs, FL 33065

Hillsboro Beach Renourishment Project
Results
Hillsboro Beach, FL 33062

Debris Monitoring Services for Natural Disasters
Term Contract
Results
Sunrise, FL 33351

Final Disposal Tipping Fee Quote for Temporary Debris Management Site Services
Post-Bid
Fort Lauderdale, FL 33301

Emergency Response
Results
Less than $150,000 est. value

Processing, Recycling, Disposal Services of Construction and Demolition Debris (C and D), Bulk and Yard Waste
Post-Bid
Coconut Creek, FL 33063

Emergency Response
Results
Less than $150,000 est. value

Disaster Debris Removal and Disposal Services
Term Contract
Post-Bid
Dania Beach, FL 33004

Lime Sludge Hauling
Term Contract
Results
Davie, FL 33314

Citywide Litter Control
Term Contract
Post-Bid
Less than $400,000 est. value
Pembroke Pines, FL

Litter and Debris Removal
Results
Less than $250,000 est. value
FL

Solid Waste and Recycling Collection
Term Contract
Post-Bid
Davie, FL 33314

Pre-Event Cut and Toss
Results

Reported 07/07/2021 12:00 AM
Project Title

Lime Sludge Removal and Hauling at the Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Hollywood, FL 33024   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all labor, equipment and supervision required to preserve the area designated to temporarily hold the waste lime sludge, and also remove, load, haul, transport and dump waste lime sludge from the Pembroke Pines Water Treatment Plant on an annual basis. The contractor shall securely transfer sludge from one settlement pond to another approximately every 4-6 weeks. The contractor shall remove, load, haul, transport and dump the waste lime sludge every 6-8 weeks into a permitted receiving facility in compliance with all applicable Federal, State and local laws, regulations and licenses requirements. The complete removal of all lime sludge shall be completed within 1-3 days’ time frame, weather permitting. Vendor shall assume full responsibility for the safety, street sweeping/clean-up, transfer, transportation and disposal of the waste lime sludge in accordance with all applicable regulations.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents