Similar Projects
Alleghany Road Distribution Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Corfu, NY 14036

Excelsior Energy Center
New Construction, Infrastructure
Design
$345,550,000 CJ est. value
Batavia, NY 14020

Alleghany Road Multi-Residential Development
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Corfu, NY 14036

Roadway Improvements to NYS Route 63
Infrastructure
Bidding
$5,000,000 CJ est. value
Batavia, NY 14020

Rehabilitation of Oak Orchard Road Bridge Over Oak Orchard Creek
Infrastructure
Bidding
$2,000,000 CJ est. value
Batavia, NY 14020

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Provide Forensic Identification Unit and Additions - Electrical Work
Addition, Demolition, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Batavia, NY 14020

2020 Capital Improvement Project Contract 105: Site Work
Infrastructure
Results
$1,857,000 est. value
Alexander, NY

Culvert Rehabilitations, Drainage Repairs and Miscellaneous Work
Infrastructure
Results
$2,167,958 CJ est. value
Batavia, NY 14020

Plug Power
New Construction, Infrastructure
Construction
$290,000,000 CJ est. value
Alabama, NY 14013

Ivy Village Senior Apartments
New Construction, Infrastructure - 105,935 SF
Pending Verification
$22,000,000 CJ est. value
Le Roy, NY 14482

Cider Solar Farm
New Construction, Infrastructure
Pending Verification
$550,000,000 CJ est. value
Elba, NY 14058

Main Road Solar
Infrastructure
Design
$11,000,000 CJ est. value
Le Roy, NY 14482

Walker Road 1.63 Million Gallon Water Storage Tank
Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Pavilion, NY 14525

Town of Alexander Water District No. 6
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Alexander, NY 14005

Last Updated 07/26/2023 06:01 AM
Project Title

Jackson Street Water System Improvement Project

Physical Address View project details and contacts
City, State (County) Batavia, NY 14020   (Genesee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of approximately 2,250 linear feet of new 8-inch watermains and appurtenances to replace existing 4-inch and 6-inch watermains on Jackson Street from Chestnut Street to Ellicott Street . The Contract Documents may be viewed and ordered through Avalon Plan Room, at:avalonbuff-planroom.com/jobs/public in the 'Public Bid' section. If you do not have internet access or have questions on ordering from the site, please contact Avalon Document Services at (716) 995-7777 Bids must be submitted on the form(s) furnished in the Proposal Booklet. The entire Proposal Booklet shall be submitted with the bid along with any other required forms outlined in the Contract Documents. Failure to submit a bid on the proposal form(s) furnished in the Proposal Booklet, will result in automatic disqualification of bid. Addendum pages, if issued, along withany other required forms outlined in the Contract Documents, shall be stapled to the original pages of the Proposal Booklet and submitted as part of the Bid. A bid security in the amount of 5% of the total bid made payable to the 'City of Batavia' will be required and is subject to the conditions provided in the Instructions to Bidders. Failure to submit a bid bond or certified check with bid will result in automatic disqualification of bid. If, upon acceptance of his bid, a bidder fails to enter into a Contract with the City of Batavia, the bid security shall be forfeited to and become the property of the City. No bidder may withdraw his Bid within forty-five (45) calendar days after the actual date of the opening thereof. The successful bidder will be required to furnish a performance bond and payment bond, each in an amount equal to 100 percent (100%) of the total Contract award amount. The City of Batavia is exempt from the payment of sales and compensating use taxes of the State of New York and of cities and counties on all materials, equipment, and supplies sold to the City of Batavia pursuant to this Contract. Also exempt from such taxes are purchases by the CONTRACTOR and his Subcontractors of materials, equipment, and supplies to be sold to the City of Batavia pursuant to this Contract, including tangible personal property to be incorporated in any structure, building, or other real property forming part of the Project. These taxes are not to be included in the Bid. The City of Batavia reserves the right to waive any informalities in the Bid and to reject any or all Bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents