Reported 03/04/2022 12:00 AM
Project Title

Shoreline Litter Removal

Physical Address View project details and contacts
City, State (County) Mobile, AL   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to perform shoreline trash and litter collection and removal along the following Alabama State Port Authority properties: Three Mile Creek and the Industrial Canal, Garrows Bend Channel, and Arlington Park. Disposal of the collected trash and litter should be at an approved landfill. The project includes, but is not limited to collection of trash and litter and transporting and disposing of the trash and litter in an approved landfill. The work will be in accordance with the requirementsstated herein, attached scope of work and specifications, referenced figures, insurance requirements and applicable State of Alabama Laws. The work consists principally of providing labor, materials, equipment, insurance, and supervision necessary for collection and disposal of trash and litter as described in the contract documents. The project site is located along the shoreline of Three Mile Creek, the Industrial Canal, Garrows Bend Channel, and Arlington Park in Mobile, Alabama. The Litter Collection Staging Areas are shown on Figures 2 and 5. Collected litter must be transferred to a waste container at a staging area until removed off site for disposal. No heavy equipment is to be used near the wetlands and any damage to the wetlands will be repaired by the contractor

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents