Similar Projects
Main Street Fire Station Replacement Project - City of Lewiston
Demolition, New Construction, Infrastructure
Conception
$4,002,093 CJ est. value
Lewiston, ME 04240

Canal Street Parking Garage Building Repairs - City of Lewiston
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Redundant Water Transmission Main Installation - City of Lewiston
Infrastructure
Design
$5,500,000 CJ est. value
Lewiston, ME 04241

Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage and Safety Improvements - Turner - Region 3
Infrastructure
Bidding
$2,328,000 CJ est. value
Turner, ME 04282

Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage and Safety Improvements - Turner - Region 3
Infrastructure
Bidding
$2,328,000 CJ est. value
Turner, ME 04282

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paving and Catch Basin Improvements at Family Development
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Auburn, ME 04210

Statewide Geotechnical Drilling
Infrastructure
Results

Fairlawn Avenue Water Main Replacement and Road Rehab
Infrastructure
Results
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

Strawberry Avenue Self-Storage
New Construction, Infrastructure - 28,400 SF
Pending Verification
$3,000,000 CJ est. value
Lewiston, ME 04240

Lewiston Public Works Fueling Station Design and Construction - City of Lewiston
New Construction, Infrastructure
Conception
$2,321,000 CJ est. value
Lewiston, ME 04240

Brickyard Commons - Auburn
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Auburn, ME 04210

Pavement Milling, Ultra-Thin Bonded Wearing Course with Drainage and Safety Improvements - Canton, Hartford and Livermore - Region 3
Infrastructure
Bidding
$4,000,000 CJ est. value
Greene, ME 04236

Last Updated 04/17/2023 05:06 PM
Project Title

Haley Street, Warren Ave, and Webber Ave Water Main Replacement

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $640,370 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the HALEY STREET, WARREN AVENUE, AND WEBBER AVENUE WATER MAIN REPLACEMENT shall consist of, but not be limited to, the complete and satisfactory construction and installation of: - 2,050 LF of 6" Dia. DI Water Main - 590 LF of 3/4 " Copper Water Services - 250 CY Aggregate Base (MDOT 703.06 Type A) - 950 CY Aggregate Subbase (MDOT 703.06 Type D) - 500 Ton of 12.5mm HMA Surface Course - 635 Ton of 19mm HMA Base Course - 5,625 SY of Pavement Removal Work will include the installation of a new water main and services within the entirety of Haley Street, ~910-ft of water main in Warren Avenue, and ~420-ft of water main in Webber Avenue, as indicated on the bid plans. The existing pavement within Warren Avenue, Haley Street, and Herbert Street will need to be removed and repaved with base & finish surfaces to the full street width. The existing pavement within Webber Avenue will need to be removed and repaved with base & finish surface to the extents shown on the plan. Coordination with the Water District for requisite shut-downs will be required. No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of five percent (5%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work. Questions and Requests for Information shall be submitted to John Skelley (jskelley@lewistonmaine.gov) on or before noon, March 30, 2023. Questions and RFIs will be responded to via email to potential bidders on the Plan Holders List and those registered with the City Purchasing Department for this project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents