Last Updated | 08/24/2023 12:34 PM |
Project Title | Project Grace |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, NC 28401 (New Hanover County) |
Category(s) | Commercial, Entertainment/Recreation, Government/Public, Heavy and Highway |
Sub-Category(s) | Library - Public, Museum, Office, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Contract Award, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $50,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 24, 2023, construction is expected to begin in the new year. This project will house the New Hanover County Public Library Downtown Branch, Cape Fear Museum, and New Hanover County meeting spaces. The program of spaces includes a lobby, meeting rooms, museum exhibit galleries (indoor and outdoor), library stacks, open library seating, administration space, loading dock, storage and building support. Museum exhibit construction and installation will be done under a separate contract/project. The building is approximately 85,000 SF in a 3-story, post-tensioned concrete structure. A large canopy supported by steel structure has photovoltaic panels within a steel grid frame. Exterior building materials include brick masonry, metal panels, aluminum curtainwall and storefront, and TPO roofing membrane. Interior finish materials include terrazzo flooring, carpet, wood and wood-look ceilings, acoustic ceiling tile, painted gypsum board, and metal panels. The third floor includes occupied outdoor space with an elevated paver system. Site work includes relocation of above-ground utilities to underground, project-related utilities, landscape and hardscape. Work at the existing adjacent parking deck include demolition of existing stair and elevator shaft, installation of fans on all levels, select demolition for pedestrian connections to new building, and installation of transformer and generator. A new stair and elevator tower will be constructed that serves both the existing parking deck and the new Library/Museum building and other Work indicated in the Contract Documents. |
||||||||||||||||||||||||||||||||||||||||||
Details | 3 Stories Above Grade, 85,000 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |