Similar Projects
St. Marys River Streambank Restoration Phase II
Infrastructure
Bidding
Fort Wayne, IN 46805

BL000A - Storm Water Site Drainage - Union Street
Infrastructure
Bidding
Bloomington, IN 47406

Culvert Replacement
Post-Bid
Greenfield, IN

Lake Lemon Sediment Improvement
Post-Bid
$1,500,000 to $2,000,000 est. value
Unionville, IN

Lawrence Trades District Drainage Improvements
Results
$1,200,000 to $1,400,000 est. value
Indianapolis, IN

Asphalt Resurface and Small Structure Pipe Lining
Results
IN

Drainage Structures 2021
Post-Bid
Paoli, IN

North Shore Drive Bank Stabilization
Results
South Bend, IN 46617

Pike Lake Shoreline Restoration
Post-Bid
Warsaw, IN 46580

Bauer Ditch Drain Tile Reconstruction
Results
Westville, IN

Regulated Drains Maintenance
Post-Bid
Evansville, IN

Small Structure Pipe Lining
Results

2021 Helen P. Brown Natatorium Bulkhead Replacement
Post-Bid
Fort Wayne, IN 46806

IDIQ Soil Nailed Wall and MSE Repair
Results

Ditch Maintenance
Post-Bid
Terre Haute, IN 47803

Reported 04/02/2022 12:00 AM
Project Title

Maintenance Repair of the Ditches

Physical Address View project details and contacts
City, State (County) Rensselaer, IN   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents