Similar Projects
Armor Joint Repairs and Joint Sealing on Various Roads and Bridges, Precinct 3
Results
Houston, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

Harvest Townside Phase 2 Paving
Results
TX

Harvest Townside Phase 2 Mass Grading
Results
TX

Southern Region Disaster Recovery Support BPA
Results

Last Updated 04/08/2021 07:41 AM
Project Title

SL250 - Highway Improvement

Physical Address View project details and contacts
City, State (County) TX   (Midland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $23,117,478
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

104 6001 Removing Conc (Pav) Sy 16,129.000 1 104 6009 Removing Conc (Riprap) Sy 1,153.000 2 104 6011 Removing Conc (Medians) Sy 339.000 3 104 6015 Removing Conc (Sidewalks) Sy 399.000 4 104 6022 Removing Conc (Curb And Gutter) Lf 16,957.000 5 104 6023 Removing Conc (Ctb) Lf 338.000 6 104 6032 Removing Conc (Wheelchair Ramp) Sy 36.000 7 104 6044 Removing Conc (Flume) Sy 832.000 8 105 6041 Removing Stab Base And Asph Pav(8") Sy 48,274.000 9 105 6051 Removing Stab Base And Asph Pav(7"-10") Sy 51,181.000 10 106 6002 Obliterating Abandoned Road Sy 19,907.000 11 110 6001 Excavation (Roadway) Cy 34,106.000 12 132 6006 Embankment (Final)(Dens Cont)(Ty c) Cy 30,346.000 13 150 6002 Blading Hr 50.000 14 164 6035 Drill Seeding (Perm) (Rural) (Clay) Sy 238,624.000 15 216 6001 Proof Rolling Hr 50.000 16 247 6064 Fl Bs (Cmp In Plc)(Ty a Gr 4) (6") Sy 36,250.000 17 251 6079 Rework Bs Mtl (Ty d)(Surf)(Ord Comp) Sy 95,623.000 18 310 6005 Prime Coat (Ae-p) Gal 22,759.000 19 315 6004 Fog Seal (Css-1h) Gal 22,618.000 20 316 6017 Asph (Ac-20-5tr) Gal 42,403.000 21 316 6224 Aggr(Ty-Pb Gr-4 Sac-b) Cy 1,163.000 22 346 6040 Stone-Mtrx-Asph Smar-f Sac-a Ton 10,548.000 23 360 6020 Conc Pvmt (Jointed - Cpcd) (10") Sy 31,095.000 24 405 6003 Foundaton Loadtest(d4945)(Drilld Shaft) Ea 1.000 25 416 6004 Drill Shaft (36 In) Lf 198.000 26 416 6006 Drill Shaft (48 In) Lf 40.000 27 416 6010 Drill Shaft (72 In) Lf 76.000 28 416 6016 Drill Shaft (Sign Mts) (12 In) Lf 32.000 29 416 6018 Drill Shaft (Sign Mts) (24 In) Lf 163.000 30 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 344.000 31 420 6013 Cl c Conc (Abut) Cy 25.200 32 420 6029 Cl c Conc (Cap) Cy 145.300 33 420 6037 Cl c Conc (Column) Cy 77.400 34 422 6002 Reinf Conc Slab (Hpc) Sf 12,480.000 35 423 6001 Retaining Wall (Mse) Sf 19,376.000 36 425 6039 Prestr Conc Girder (Tx54) Lf 1,864.800 37 432 6001 Riprap (Conc)(4 In) Cy 66.250 38 432 6006 Riprap (Conc)(Cl b) Cy 15.050 39 432 6008 Riprap (Conc)(Cl b)(Rr8&Rr9) Cy 20.000 40 432 6044 Riprap (Conc)(Flume) Cy 52.000 41 432 6045 Riprap (Mow Strip)(4 In) Cy 188.000 42 450 6023 Rail (Ty Sstr) Lf 2,332.000 43 454 6018 Sealed Expansion Joint (4 In) (Sej - m) Lf 104.000 44 462 6051 Conc Box Culv (5 Ft x 3 Ft)(Extend) Lf 240.000 45 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 153.000 46 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 1,066.000 47 465 6179 Inlet (Compl)(Ty Mse2) Ea 2.000 48 465 6186 Manh(Compl)(Ty 1 ) Ea 4.000 49 465 6187 Inlet(Compl)(Drop)(Ty 1)(1 Grate) Ea 8.000 50 466 6180 Wingwall (Pw - 1) (Hw=5 Ft) Ea 2.000 51 467 6345 Set (Ty Ii) (18 In) (Cmp) (4: 1) (c) Ea 2.000 52 467 6390 Set (Ty Ii) (24 In) (Rcp) (4: 1) (c) Ea 4.000 53 479 6001 Adjusting Manholes Ea 7.000 54 479 6002 Adjusting Inlets Ea 1.000 55 480 6001 Clean Exist Culverts Ea 1.000 56 496 6002 Remov Str (Inlet) Ea 3.000 57 496 6004 Remov Str (Set) Ea 1.000 58 496 6006 Remov Str (Headwall) Ea 2.000 59 496 6007 Remov Str (Pipe) Lf 449.000 60 500 6001 Mobilization Ls 1.000 61 502 6001 Barricades, Signs And Traffic Handling Mo 15.000 62 506 6003 Rock Filter Dams (Install) (Ty 3) Lf 92.000 63 506 6011 Rock Filter Dams (Remove) Lf 92.000 64 506 6020 Construction Exits (Install) (Ty 1) Sy 333.000 65 506 6024 Construction Exits (Remove) Sy 333.000 66 506 6042 Biodeg Erosn Cont Logs (Instl) (18") Lf 3,828.000 67 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 3,828.000 68 508 6001 Constructing Detours Sy 11,745.000 69 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 15,800.000 70 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 460.000 71 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 30,020.000 72 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 1,560.000 73 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 15,800.000 74 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 460.000 75 512 6089 Ptb(Frn&Instl)(Sscb Or Csb)(Ty1)Or(Stl) Lf 15,330.000 76 512 6090 Ptb(Move)(Sscb Or Csb)(Ty1)Or(Stl) Lf 23,070.000 77 512 6091 Ptb(Remove)(Sscb Or Csb)(Ty1)Or(Stl) Lf 15,330.000 78 514 6002 Perm Ctb (Sgl Slope) (Ty 2) (42 ) Lf 543.000 79 514 6013 Perm Ctb (f-Shape) (Ty 1) Lf 400.000 80 528 6006 Remove And Relay Pavers Sy 75.000 81 529 6002 Conc Curb (Ty Ii) Lf 354.000 82 529 6005 Conc Curb (Mono) (Ty Ii) Lf 664.000 83 529 6008 Conc Curb & Gutter (Ty Ii) Lf 20,043.000 84 530 6004 Driveways (Conc) Sy 856.000 85 530 6007 Turnouts (Conc) Sy 2,034.000 86 531 6001 Conc Sidewalks (4") Sy 314.000 87 531 6017 Curb Ramps (Ty 22) Ea 12.000 88 533 6003 Rumble Strips (Shoulder) Asphalt Lf 14,456.000 89 536 6002 Conc Median Sy 292.000 90 540 6002 Mtl w-Beam Gd Fen (Steel Post) Lf 3,046.000 91 540 6004 Mtl Thrie-Beam Gd Fen (Steel Post) Lf 50.000 92 540 6008 Mtl Beam Gd Fen Trans (t101) Ea 6.000 93 540 6016 Downstream Anchor Terminal Section Ea 3.000 94 542 6001 Remove Metal Beam Guard Fence Lf 3,478.000 95 542 6002 Remove Terminal Anchor Section Ea 2.000 96 542 6005 Rm Mtl Bm Gd Fen Trans (t101) Ea 2.000 97 544 6001 Guardrail End Treatment (Install) Ea 6.000 98 544 6003 Guardrail End Treatment (Remove) Ea 4.000 99 545 6003 Crash Cush Atten (Move & Reset) Ea 9.000 100 545 6005 Crash Cush Atten (Remove) Ea 9.000 101 545 6006 Crash Cush Atten (Instl)(l)(n)(Tl2) Ea 5.000 102 545 6007 Crash Cush Atten (Instl)(l)(n)(Tl3) Ea 4.000 103 545 6020 Crash Cush Atten (Instl)(s)(n)(70) Ea 3.000 104 610 6009 Remove Rd Il Asm (Trans-Base) Ea 31.000 105 610 6101 Replace Luminaire w/Led (150w Eq) Ea 8.000 106 610 6102 Replace Luminaire w/Led (250w Eq) Ea 95.000 107 610 6104 In Rd Il (u/p) (Ty 1) (150w Eq) Led Ea 2.000 108 610 6206 In Rd Il (Ty Sa) 40s-8 (250w Eq) Led Ea 5.000 109 610 6214 In Rd Il (Ty Sa) 40t-8 (250w Eq) Led Ea 43.000 110 618 6023 Condt (Pvc) (Sch 40) (2") Lf 12,323.000 111 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 471.000 112 618 6029 Condt (Pvc) (Sch 40) (3") Lf 53.000 113 618 6047 Condt (Pvc) (Sch 80) (2") (Bore) Lf 155.000 114 618 6062 Condt (Rm) (3/4") Lf 18.000 115 618 6070 Condt (Rm) (2") Lf 69.000 116 620 6003 Elec Condr (No.12) Bare Lf 32.000 117 620 6004 Elec Condr (No.12) Insulated Lf 64.000 118 620 6008 Elec Condr (No.8) Insulated Lf 32,386.000 119 620 6009 Elec Condr (No.6) Bare Lf 15,362.000 120 620 6010 Elec Condr (No.6) Insulated Lf 740.000 121 624 6002 Ground Box Ty a (122311)w/Apron Ea 32.000 122 624 6028 Remove Ground Box Ea 4.000 123 628 6002 Remove Electrical Services Ea 2.000 124 628 6045 Elc Srv Ty a 240/480 060(Ns)Ss(e)Sp(o) Ea 5.000 125 628 6152 Elc Srv Ty d 120/240 060(Ns)Ss(n)Sp(o) Ea 1.000 126 636 6001 Aluminum Signs (Ty a) Sf 785.000 127 636 6002 Aluminum Signs (Ty g) Sf 1,535.500 128 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(p) Ea 3.000 129 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(t) Ea 61.000 130 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(u) Ea 4.000 131 644 6027 In Sm Rd Sn Sup&Am Tys80(1)Sa(p) Ea 5.000 132 644 6030 In Sm Rd Sn Sup&Am Tys80(1)Sa(t) Ea 5.000 133 644 6034 In Sm Rd Sn Sup&Am Tys80(1)Sa(u-1ext) Ea 1.000 134 644 6065 In Bridge Mnt Clearance Sgn Assm(Ty s) Ea 1.000 135 644 6076 Remove Sm Rd Sn Sup&Am Ea 92.000 136 647 6001 Install Lrss (Struct Steel) Lb 8,633.600 137 647 6003 Remove Lrsa Ea 10.000 138 658 6001 Instl Del Assm (d-Sw)Sz 1(Flx)Gnd Ea 32.000 139 658 6036 Instl Del Assm (d-Dw)Sz 1(Flx)Gnd Ea 36.000 140 662 6001 Wk Zn Pav Mrk Non-Remov (w)4"(Brk) Lf 7,307.000 141 662 6004 Wk Zn Pav Mrk Non-Remov (w)4"(Sld) Lf 26,529.000 142 662 6012 Wk Zn Pav Mrk Non-Remov (w)8"(Sld) Lf 10,255.000 143 662 6014 Wk Zn Pav Mrk Non-Remov (w)12"(Sld) Lf 2,433.000 144 662 6031 Wk Zn Pav Mrk Non-Remov(w)36"(Yld Tri) Ea 16.000 145 662 6034 Wk Zn Pav Mrk Non-Remov (y)4"(Sld) Lf 31,288.000 146 662 6060 Wk Zn Pav Mrk Remov (w)4"(Brk) Lf 6,522.000 147 662 6063 Wk Zn Pav Mrk Remov (w)4"(Sld) Lf 44,857.000 148 662 6071 Wk Zn Pav Mrk Remov (w)8"(Sld) Lf 6,064.000 149 662 6073 Wk Zn Pav Mrk Remov (w)12"(Sld) Lf 3,569.000 150 662 6092 Wk Zn Pav Mrk Remov (w)36"(Yld Tri) Ea 15.000 151 662 6095 Wk Zn Pav Mrk Remov (y)4"(Sld) Lf 56,939.000 152 666 6006 Refl Pav Mrk Ty i (w)4"(Dot)(100mil) Lf 214.000 153 666 6036 Refl Pav Mrk Ty i (w)8"(Sld)(100mil) Lf 12,025.000 154 666 6042 Refl Pav Mrk Ty i (w)12"(Sld)(100mil) Lf 2,980.000 155 666 6300 Re Pm w/Ret Req Ty i (w)4"(Brk)(100mil) Lf 8,432.000 156 666 6303 Re Pm w/Ret Req Ty i (w)4"(Sld)(100mil) Lf 28,885.000 157 666 6315 Re Pm w/Ret Req Ty i (y)4"(Sld)(100mil) Lf 38,636.000 158 666 6350 Refl Pav Mrk Ty i (w)12"(Dot)(100mil) Lf 640.000 159 668 6076 Prefab Pav Mrk Ty c (w) (24") (Sld) Lf 795.000 160 668 6077 Prefab Pav Mrk Ty c (w) (Arrow) Ea 28.000 161 668 6078 Prefab Pav Mrk Ty c (w) (Dbl Arrow) Ea 10.000 162 668 6080 Prefab Pav Mrk Ty c (w) (Uturn Arrow) Ea 8.000 163 668 6085 Prefab Pav Mrk Ty c (w) (Word) Ea 29.000 164 668 6092 Prefab Pav Mrk Ty c (w) (36")(Yld Tri) Ea 60.000 165 672 6007 Refl Pav Mrkr Ty i-c Ea 207.000 166 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 1,157.000 167 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 36,113.000 168 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 3,826.000 169 677 6005 Elim Ext Pav Mrk & Mrks (12") Lf 301.000 170 1000 6002 Shrub Planting And Removal Ea 41.000 171 3077 6007 Sp Mixes Sp-b Sac-b Pg70-22 Ton 49,203.000 172 3077 6075 Tack Coat Gal 11,280.000 173 3084 6001 Bonding Course Gal 12,799.000 174 4021 6001 Tip Testing(Drill Shaft) Ea 4.000 175 6001 6002 Portable Changeable Message Sign Ea 6.000 176 6010 6011 Cctv Field Equip (Digital) (Instl Only) Ea 1.000 177 6062 6041 Its Radio (Install Only) Ea 1.000 178 6064 6055 Its Pole (60 Ft)(90 Mph) Ea 1.000 179 6064 6080 Its Pole Mnt Cab (Ty 2)(Conf 1) Ea 1.000 180 6123 6001 Ethernet Switch (Install Only) Ea 1.000 181 6185 6002 Tma (Stationary) Day 1,770.000 182 6185 6005 Tma (Mobile Operation) Day 20.000 183

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents