Similar Projects
Last Updated | 04/26/2021 09:14 AM |
Project Title | 15th Avenue North to 8th Avenue North Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | MN (Hennepin County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work of this project includes 1. Rehabilitate 1,850 feet of 1-MN-310 from 15th Avenue North to 8th Avenue North (between maintenance holes MH 12 to MH 6) using CIPP lining. 2. Rehabilitate MH 11 through MH 6 using cementitious liner. (The City will remove and replace MH 13 and MH 12 as part of their project.) 3. Clean and inspect the siphon to prepare for a future project that will rehabilitate the siphon and the remainder of the Condition 4 pipe to Shaft 1. 4. Provide vehicle, bike, and pedestrian traffic control; erosion and sediment control; pavement, sidewalk, and curb and gutter removal and replacement; temporary sewage conveyance; and temporary odor controls as required to complete the project scope. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |