Similar Projects
Northfield - Alma Center Construction / Resurface
Infrastructure
Conception
$3,000,000 est. value
Hixton, WI 54635

RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Bidding
$19,999,999 CJ est. value
Black River Falls, WI 54615

RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Bidding
$19,999,999 CJ est. value
Black River Falls, WI 54615

Mowing
Term Contract
Sub-Bidding
Taylor, WI 54659

2021 Road Improvements
Post-Bid
Black River Falls, WI

Road Projects
Infrastructure
Post-Bid
Hixton, WI 54635

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Local Street Improvement
Results
$1,000,000 est. value
Franklin, WI

2021 Jackson County Parking Lots
Renovation
Construction
Black River Falls, WI

RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Bidding
$20,000,000 CJ est. value
Hixton, WI 54635

Sandberg Road Chip Seal
Infrastructure
Post-Bid
$610,000 est. value
Melrose, WI 54642

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Ho-Chunk Wazee Community Water and Sanitary Sewer Extensions
Infrastructure
Bidding
$200,000 CJ est. value
Black River Falls, WI 54615

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Winnebago Avenue and Van Buren Street Improvements
Results
Black River Falls, WI 54615

Last Updated 07/28/2022 10:31 AM
Project Title

Asphalt Replacement and Repair

Physical Address View project details and contacts
City, State (County) Black River Falls, WI 54615   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $174,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: the pulverizing and paving of approximately 10,000 square yards of asphalt roadway. The pavement to be replaced includes the entirety of the outer perimeter roadway, as well as paving the existing grave drive near P Building. The A Building roof drain concrete pad will also be removed and replaced. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bidders that would like to attend this conference must provide a Facility Security Clearance Background Check form with full name, date-of-birth, driver's license number and state of issue for all attendees in their group. Send form to Rob Mann, JCI Building and Grounds Superintendent, 715-284-7396, Robert.Mann@wisconsin.gov, at least 5-calendar-days prior to the start of the pre-bid tour. This notice is to allow for a background check to be completed prior to the start of the pre-bid tour.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents