Similar Projects
New Auburn High School #2 - Auburn City Schools - 4257758
New Construction
Conception
$77,180,000 est. value
Auburn, AL 36830

STEAM Academy - Chambers County Schools
Renovation
Conception
$5,000,000 est. value
Lafayette, AL 36862

Guntersville High School - Guntersville City Education Board
Addition, Demolition, Infrastructure
Design
$45,000,000 CJ est. value
Guntersville, AL 35976

Repair Maxwell AFB Elementary School Building 538A and 538A1
Renovation
Bidding
$25,000,000 CJ est. value
Montgomery, AL 36112

Addition to Deshler High School Tuscumbia, Alabama
Addition, Demolition, Infrastructure
Bidding
$400,000 CJ est. value
Tuscumbia, AL 35674

Demolition of Auditorium at W.S. Neal High School
Demolition, Infrastructure
Sub-Bidding
$290,000 CJ est. value
East Brewton, AL 36426

Roof Replacement or Repair
Renovation
Sub-Bidding
$300,000 CJ est. value
Birmingham, AL 35233

Auburn City Schools Dental Clinic
Renovation - 1,500 SF
Post-Bid
Auburn, AL 36830

Sylvania High School Science Classroom Addition
Addition
Post-Bid
Sylvania, AL 35988

Science Lab Renovation for Geneva County High School
Renovation
Results
$414,500 est. value
Hartford, AL 36344

Addition to Existing Athletics for Hartselle High School
Addition
Results
Hartselle, AL 35640

A New Gymnasium at Zion Chapel High School
New Construction - 19,490 SF
Construction
Less than $4,325,000 est. value
Elba, AL 36346

9th Grade Academy Addition to Daphne High School
Addition
Construction
Daphne, AL 36526

New School - Pelham City Schools
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Pelham, AL 35124

Bush Steam Academy Upgrades
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Birmingham, AL 35208

Last Updated 08/05/2022 09:32 AM
Project Title

James Clemens High School Jet Pedestal

Physical Address View project details and contacts
City, State (County) Madison, AL 35758   (Madison County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

James Clemens High School Jet Pedestal A cashier's check or bid bond payable to City of Madison Board of Education in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Other sets for general contractors, and sets for subcontractors and dealers, may be obtained with the same deposit, which will be refunded as above, less cost of printing, reproduction, handling, and distribution. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Nonresident bidders must accompany any written bid documents with a written opinion of an attorney at law licensed to practice law in such nonresident bidder's state of domicile, as to the preferences, if any or none, granted by the law of that state to its own business entities whose principal places of business are in that state in the letting of any or all public contracts. Notice of Sales & Use Tax Exemption: Materials incorporated into the Work are exempt from sales and use tax pursuant to Alabama Act No. 2013-205 (effective October 1, 2013). The Contractor and its subcontractors shall be responsible for complying with rules and regulations of the Sales, Use, and Business Tax Division of the Alabama Department of Revenue regarding certificates and other qualifications necessary to claim such exemption when making qualifying purchases from vendors. The Owner shall not consider claims for additional costs resultant of the contractor's, or its subcontractors', failure to comply with such rules and regulations.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents