Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Paving Watson A Road
Post-Bid
Hillsboro, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

2020 Highland County Chip Seal Program
Results
OH

Pavement Resurfacing
Results
Lynchburg, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Two Lane Resurfacing - US 62-10.38
Results
OH

Taxiway, Taxilane, and Apron Crack Repair, Crack Sealing, and Pavement Sealing
Infrastructure
Post-Bid
Hillsboro, OH 45133

Two Lane Resurfacing -SR 134-11.24 Overlay
Results
OH

2021 Road Program
Infrastructure
Post-Bid
OH

Petersburg Road and Overman Road Intersection Improvements
Results
Less than $1,007,317 est. value
OH

2021 Chip and Seal
Infrastructure
Post-Bid
Hillsboro, OH

Spring Lake Avenue Reconstruction
Results
$625,000 est. value
Hillsboro, OH

Chip and Seal
Infrastructure
Post-Bid
Greenfield, OH

Pavement Resurfacing
Results
Lynchburg, OH

Last Updated 12/17/2021 01:01 PM
Project Title

2021 Street Paving Project

Physical Address View project details and contacts
City, State (County) Hillsboro, OH   (Highland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $69,715
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pave North East Street from Collins Avenue to SR 138. A butt joint consisting of milling out existing pavement to allow for a smooth transition between existing and proposed pavement shall be required on pavement overlays. The minimum depth of asphalt at the butt joints shall be 1 ½ inch. All joints shall be sealed with a bituminous sealer. All areas overlaid shall also include a layer of ODOT 407 Tack Coat on the existing pavement applied at a rate of 0.09 gallons / S.Y. There shall also be a 1 foot wide berm using ODOT Item 411 Stabilized Crushed Aggregate in areas where no curb or sidewalk except in the area where west side of street is parallel to the area with curb and sidewalk. Pavement Planing shall be done in the areas of curbing and sidewalk adjacent to the street. Full depth base repair with ODOT Item 301 Asphalt Concrete Base to a depth of 4” shall be done from the intersection of Speigle Street to the creek crossing in the second curve where the road base has failed. Manholes and valve boxes shall be adjusted to grade using grade rings to ensure that manhole is level with the proposed pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents