Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

High School Parking Lot and Tennis Courts
New Construction, Infrastructure
Bidding
$500,000 est. value
Poulsbo, WA 98370

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Breakwater Replacement
Infrastructure
Post-Bid
Poulsbo, WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Systemic Safety Improvements
Infrastructure
Post-Bid
$180,000 to $210,000 est. value
Poulsbo, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Burley Glenwood Elementary School - ADA Site Improvements
Infrastructure
Post-Bid
$500,000 to $600,000 est. value
Port Orchard, WA 98367

Olympiad Drive Culvert Replacement
Infrastructure
Results
$315,635 est. value
Port Orchard, WA 98366

Construction Management Services
Alteration
Post-Bid
Bremerton, WA

SR 305, Murden Creek - Remove Fish Barrier
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

Price Road and Brentwood Drive Culvert Replacement
Infrastructure
Results
$1,892,358 est. value
Bremerton, WA 98312

Lippert Road Repair and Sidewalk Retrofit Project
Infrastructure
Results
$590,000 est. value
Port Orchard, WA 98366

Last Updated 05/16/2022 04:30 AM
Project Title

Central Valley Road Non Motorized Improvements

Physical Address View project details and contacts
City, State (County) WA   (Kitsap County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description of work: This contract provides for the installation of concrete curb, gutter, and sidewalk, bike lane, and associated drainage improvements, along the west side of Central Valley Road NE from approximately 250 feet north of NE Fairgrounds Road to Foster Road NE in central Kitsap County. The project will also convert the existing paved shoulder along the east side of Central Valley Road NE to a marked bike lane, providing bike lanes in both directions. The work proposed consists of Preparation, Excavation, Grading, Erosion Control and Planting, Paving, Curb and Gutter, Concrete Sidewalks, Storm Sewer and Water Quality Facilities, Traffic Safety and Control, and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Controls, Temporary Storm Water Pollution Control.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents