Similar Projects
Bartlett Bay Upgrades - City of South Burlington
Infrastructure
Conception
$17,600,000 est. value
South Burlington, VT

Commerce Avenue Force Line Replacement - City of South Burlington
Infrastructure
Conception
$275,000 est. value
South Burlington, VT 05403

Derby Public Safety Parking Lot Restoration
Infrastructure
Bidding
$300,000 CJ est. value
Newport, VT 05855

Buildings and General Services (BGS) Sharon Welcome Center Sidewalk Replacement
Infrastructure
Bidding
$100,000 CJ est. value
Sharon, VT 05068

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Colonial Drive Improvements
Infrastructure
Results
$950,000 est. value
Middlebury, VT 05753

Post Road Water Main Extension
Infrastructure
Results
Rutland, VT 05701

Professional Engineering Services - Replacement and Reconstruction of Utility Lines
Infrastructure
Pending Verification
$250,000 CJ est. value
Hartford, VT 05047

Professional Engineering Services (Water Mains) - South Street and James Street
Infrastructure
Pending Verification
$300,000 CJ est. value
White River Junction, VT 05001

Poor Farm Road 8" Waterline - 500-057-P - Town of Milton
Infrastructure
Conception
$2,900,000 CJ est. value
Milton, VT 05468

Fairview Terrace Water Main Replacement
Infrastructure
Bidding
$700,000 CJ est. value
Hartford, VT 05001

On-Call Services for Water Resources Utility Repairs and Excavation Projects
Infrastructure
Post-Bid
$100,000 to $200,000 est. value
Burlington, VT

Websterville Water Mains
Infrastructure
Results
Barre, VT

Professional Engineering Services (Water Main) - Quechee Main Street
Infrastructure
Pending Verification
$300,000 CJ est. value
White River Junction, VT 05001

Last Updated 04/12/2023 01:37 PM
Project Title

Professional Engineering Services (Utilities Design)

Physical Address View project details and contacts
City, State (County) White River Junction, VT 05001   (Windsor County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Hartford is requesting proposals for Professional Engineering Services, for the replacement and reconstruction of utility lines along Abbey Ln. and T.H. 110. Last Day to Submit Questions: 4:00 PM local E.S.T. on Monday March 25nd, 2019. Written Responses to Questions: End of Friday March 29th, 2019. The Town seeks to replace existing wastewater mains and services as needed within Abbey Lane, Garland Row and Town Highway 110. This portion of the system is aging, not constructed to current standards, lacks adequate manholes and requires a disproportional amount of maintenance and repairs. Emphasis is to be placed on the survey and evaluation task to determine ownership and properly guide the layout, methodology and potential phasing. The general location of known lines requiring replacement or improvement. The project is anticipated to consist of the following segments. Each proposal shall identify and develop a scope of services necessary complete each segment requested. Design, Construction Documents and Bid Specifications Bidding and Award Construction and Post Construction The Town reserves the right to select the successful proposer on the basis of proposals received, without seeking further information for clarification from proposers. Upon review of proposals, the Town may designate the most qualified proposals as finalists. These finalists may be invited to make oral presentations and participate in a question and answer session with the Town. The Town shall have the right to visit selected user sites, should this be deemed necessary As of March 18, 2019, The method of contractor selection has not been determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents