Similar Projects
Currie Parkway Bridge: Rehabilitation - City of Midland
Renovation, Alteration
Conception
Less than $460,000 est. value
Midland, MI 48640

Hancock Street: Jay to Clay - City of Midland
Infrastructure, Alteration
Conception
$460,000 est. value
Midland, MI 48642

Water System Upgrades Contract 1 – Watermain Replacements
Infrastructure
Bidding
$1,900,000 CJ est. value
Coleman, MI 48618

Water System Upgrades Contract 1 – Watermain Replacements
Infrastructure
Bidding
$1,900,000 CJ est. value
Coleman, MI 48618

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Wackerly Street Reconstruction
Infrastructure
Post-Bid
Midland, MI 48667

2022 Sugnet Rd. Extension MDOT LAP Construction Engineering Services
Alteration
Results
Midland, MI

2022 Soccer Drive Water Main; Contract No. 01
Alteration
Results
Midland, MI

Rodd Street Office Building
New Construction, Infrastructure - 15,200 SF
Construction
$3,000,000 CJ est. value
Midland, MI 48640

Meridian Road Retail
New Construction, Alteration - 1,000 SF
Pending Verification
$264,000 est. value
Sanford, MI 48657

Commerce Drive Multi Residential / Midland
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Midland, MI 48642

Swede Avenue: Ashman to Wheeler - City of Midland
Infrastructure
Conception
$1,375,000 est. value
Midland, MI 48642

Water System Upgrades Contract 2 - Water Meter Replacements
Infrastructure
Bidding
$544,000 CJ est. value
Coleman, MI 48618

Gensel Drive and Wackerly Road Water System Extensions
Infrastructure
Post-Bid
$400,000 est. value
Sanford, MI

2022 Pine St & North St. Reconstruction & Water Main
Alteration
Results
Midland, MI

Last Updated 06/16/2023 11:06 AM
Project Title

Nicholson Guenther Band Shell Universal Accessible Site Improvements Re-bid

Physical Address View project details and contacts
City, State (County) Midland, MI 48640   (Midland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $329,060 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 16, 2023, this project has not yet been awarded. A timeline for award has not yet been established.**  This is a Federally Funded Project with CDBG Funds. The Contractor and Subcontractors on this project must comply with HUD contract provisions 24CFR part 85.36(i), the Davis-Bacon Act, Nondiscrimination, Equal Employment Opportunity, Affirmative Action, Section 3 requirements, AntiKickback Act, Federal Occupational Safety and Health Act and Department of Labor Standards and Regulations as set forth in the Contract Bid Documents. This municipality is an equal opportunity employer, businesses owned by women or minorities are strongly encouraged to bid. The project is located in Central Park, 401 E. Nelson St., Midland, Michigan and shall include but not be limited to concrete sidewalk and seating patio, curb and gutter, vehicle drop-off area, retaining walls, and stormwater improvements. Technical questions regarding the specifications may be directed to Pam Blough, PM Blough, Inc. at 616.402.2398 or emailed to pamb@pmblough.com. General Requirements - Bid Deposit Required - Federally Funded - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Questions are submitted online No Technical questions regarding the specifications may be directed to Pam Blough, PM Blough, Inc. at 616- 402-2398 or emailed to pamb@pmblough.com. Contact Christina Evans of the Purchasing Department for questions about the Standard Terms and Conditions at 989-837-3331 or emailed to cevans@midlandmi.org. The project site is open for site visits seven days a week during normal park hours.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents