Similar Projects
STCC AC Door Replacement Project
Post-Bid
Springfield, MA 01105

Roofing Envelope Services
Post-Bid

Roofing & Siding Improvements at Beaudoin Village - Filed Sub Bids
Results
$425,000 est. value
Holyoke, MA

Community House Roof and Balustrade Replacement
Results
$187,000 est. value
Longmeadow, MA 01106

Roofing MACC
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing Repair and Maintenance
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Hampden County Correctional Center HVAC Code Deficiency Repairs - Filed Sub-Bids
Alteration
Post-Bid
$6,838,354 est. value
Ludlow, MA 01056

Beaudoin Village Roof & Siding (Phase 2) - Filed Sub Bids
Results
$1,200,000 est. value
Holyoke, MA 01040

Replacement of Lower Roof
Results
$37,224 est. value
Holyoke, MA

On-Call Roofing
Results
$16,388 est. value
Longmeadow, MA

Replacement Various Roof Types in DCR Facilities
Results
Less than $750,000 est. value

667-7 Valley View Roof Replacement
Results
Less than $146,647 est. value
Chicopee, MA 01013

Roof Replacement at Szetela School
Results
Less than $20,000 est. value
Chicopee, MA 01013

Last Updated 08/04/2021 09:17 AM
Project Title

30 Water Street Old Steam Plant Roof Replacement

Physical Address View project details and contacts
City, State (County) Holyoke, MA 01040   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $106,775
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of stripping off the existing roofing to concrete deck, recycling/disposing of material in on-site container provided by roofing contractor at HG&E specified designated area. Contractor shall mechanically attach pressure treated wood blocking on top of all parapet walls, adhere one layer of ´poly-iso to the concrete decking followed by the installation of a fully adhere .060 EPDM roofing system adhering membrane up and over parapet walls. Contractor shall fabricate and install 24 gauge Kynar coated gravel stops on all sides. Contractor shall adhere 1/2´per foot crickets between drains on south side and sumps to the four scuppers and re-flash the four existing scuppers.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents