Similar Projects
Denton Mixed-Use Redevelopment
New Construction
Conception
$75,000,000 est. value
Denton, TX

Corporate Reconstruction - T-202100 - City of Houston
Infrastructure
Conception
$6,000,000 est. value
Houston, TX 77036

Motto by Hilton
Renovation
Design
$15,000,000 est. value
Austin, TX 78701

Laneways Condominium and Hotel Tower A
New Construction - 556,917 SF
Design
$115,000,000 est. value
Houston, TX 77002

Rebid Goodfellow Air Force Base DEAAG Construction - 5G Infrastructure
New Construction, Infrastructure
Bidding
$1,200,000 CJ est. value
Goodfellow AFB, TX 76908

FM 268 - Widening of a Non-Freeway Facility
Infrastructure
Bidding
$14,085,422 CJ est. value
Childress, TX 79201

SH 6 - Spot Pavement Markings
Infrastructure
Sub-Bidding
$655,425 CJ est. value
Bryan, TX 77802

SH0078 - Reflective Pavement Markings (Long Line)
Infrastructure
Sub-Bidding
$672,809 CJ est. value
Farmersville, TX 75442

Tannery Lake Dam Reconstruction
Post-Bid
Denton, TX

Snyder Rail Park Dirtwork
Alteration
Post-Bid
$50,000 est. value
Snyder, TX

Business Park Grading Plan
Infrastructure
Results
$3,600,000 est. value
Marshall, TX 75672

Harvest Phase 16A and 16B Mass Grading
Infrastructure
Results
TX

Red Roof Inn
New Construction
Construction
$3,000,000 est. value
Hutchins, TX 75141

The Carter Development
New Construction
Construction
Grapevine, TX 76051

Amazon Remodel Project UTX8
Demolition, New Construction, Infrastructure - 10,130 SF
Pending Verification
$1,695,000 CJ est. value
San Antonio, TX 78218

Last Updated 07/25/2022 11:33 AM
Project Title

TownePlace Suites By Marriott / Orange

Physical Address View project details and contacts
City, State (County) Orange, TX 77630   (Orange County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $8,523,970 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Four stories, wood framing. As of July 25, 2022, final planning is underway. A general contractor has yet to be selected. A firm timeline has not been established, however, construction is expected to begin early October 2022.

Details

4 Stories Above Grade, 65,569 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents