Similar Projects
Last Updated | 06/21/2022 12:13 PM |
Project Title | Construction Services for the Beverly Hills East Septic Tank Phase-Out |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, FL (Duval County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes four primary components: installation of new gravity sewer mains, manholes, service laterals, pump station, and force main, sewer hookups and septic tank abandonment on the private lots, replacement of existing galvanized water mains, and the associated extensive surface restoration. The new gravity sewer system includes 16,372 LF of 8” PVC open cut gravity sewer main, 68 manholes, 8,472 LF of 6” PVC open cut sanitary service laterals (255 services), one Class 1 submersible pump station with Pony Pump system, 2,608 LF of 6” PVC open cut force main, and 207 sewer hookups with septic tank abandonments. The new water mains include replacement of existing 1”, 1.25”, 1.5”, and 2” galvanized water mains with 11,777 LF of 6” and 8” PVC, all open cut, 245 service replacements, 6 new services and 23 additional fire hydrants. The surface restoration includes the typical items required for open cut pipeline construction such as pavement repair, removal and replacement of driveways, sidewalks, curb-and-gutter, drainage pipes, fencing, and sodding. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |