Similar Projects
Duhart Forcemain Replacement
Infrastructure
Bidding
Gastonia, NC

General Services Dr. 12 Water Line Replacement
Infrastructure
Bidding
$414,315 est. value
Concord, NC

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

Reclaimed Water Main at Trinity Creek 3A and 3B
Post-Bid
Holly Springs, NC 27540

Faculty Drive Waterline Construction
Results
Wingate, NC

Wilson's Mills Water District - WTP Service Line - Contract No. 1
Results
Smithfield, NC 27577

NC A and T Craig Hall Fire Suppression Improvements
Infrastructure
Bidding
Greensboro, NC

Fire Main Water Leak Repair
Post-Bid
Elizabeth City, NC 27909

Water Distribution System Improvements
Results
Seaboard, NC

UNC Charlotte Reclaimed Water Infrastructure
Infrastructure
Bidding
$2,500,000 est. value
Charlotte, NC

Lenoir Rhyne University Area Waterline Improvements
Post-Bid
Hickory, NC 28601

2019 Water System Improvements Contract No. 147 - Interconnects
Results
Less than $829,015 est. value
Goldsboro, NC 27530

Main Campus Drive Water Main Improvements
Infrastructure
Bidding
Raleigh, NC 27616

Residential Backflow Prevention Assembly Testing and Repair - Water Management
Post-Bid
Durham, NC 27701

Water Line Improvement for Belvedere Circle Project
Results
Kings Mountain, NC

Last Updated 07/13/2021 11:52 AM
Project Title

Iron and Manganese Treatment Systems Contract A - Buried Water Piping

Physical Address View project details and contacts
City, State (County) Clinton, NC   (Sampson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principle work to be performed under this contract consists of but not limited to improvements to the following: Upgrades to Sampson County’s potable water well system includes: Approximately 3,100 LF of 12” raw water force main to convey untreated water from the Old Warsaw Road well to the treatment system at the Faison Highway well site. Approximately 4,100 LF of 12” potable watermain will be installed to convey the treated water. The project also includes site modifications including new sections of the gravel access driveway.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents