Similar Projects
Water and Sewer Project for the New 45 Travel Center
Infrastructure
Results
$78,090 est. value
Verona, MS

Rtp Recreational Trail
Infrastructure
Results
$58,547 CJ est. value
Tupelo, MS 38804

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Wastewater Facilities Improvements
Infrastructure
Post-Bid
Plantersville, MS

Tupelo High School Site Improvements
Infrastructure
Post-Bid
$100,000 est. value
Tupelo, MS 38801

Water Materials - 6 Month Supply
Term Contract
Post-Bid
Tupelo, MS

12" Ductile Iron CL350 Push-On Joint Pipe, Cement Lined
Infrastructure
Post-Bid
Tupelo, MS

Clark Place Drainage - Arch Pipe Replacement Rebid
Infrastructure
Bidding
$300,000 CJ est. value
Tupelo, MS 38804

Sources of Supply - 12 Month Supply Bid - Minor Water/Sewer Construction/Rehabilitation
Term Contract
Post-Bid
Tupelo, MS

Clark Place Drainage - Arch Pipe Replacement Rebid
Infrastructure
Bidding
$300,000 CJ est. value
Tupelo, MS 38804

Booneville/Baldwyn Airport Runway and Taxiway Overlay
Infrastructure
Results
$2,000,000 CJ est. value
Baldwyn, MS 38824

Tupelo Middle School Site Improvements
Infrastructure
Post-Bid
$75,000 est. value
Tupelo, MS 38801

Roadway Maintenance Program - 2022 Annual Bid
Term Contract
Results
Tupelo, MS

Construction of 0.084 Miles of Precast Concrete Span Bridge and Approaches to Replace Bridge No. 181 on CR 1149
Demolition, New Construction, Infrastructure
Results
$505,484 CJ est. value
Tupelo, MS 38804

Church Street School Site Improvements
Infrastructure
Post-Bid
$275,000 est. value
Tupelo, MS 38804

Last Updated 08/29/2022 09:22 AM
Project Title

Saltillo Sportsplex Drainage

Physical Address View project details and contacts
City, State (County) Saltillo, MS 38866   (Lee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $215,070 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SALTILLO SPORTSPLEX DRAINAGE CITY OF SALTILLO, MISSISSIPPI This work consists of rock riprap removal, stormwater piping, earthwork, drainage structures and related items located within the City limits of Saltillo, MS. Definite quantities to be bid are shown in the Contract Documents. Each bid submitted must be marked on the outside Bid for SALTILLO SPORTSPLEX DRAINAGE. Any bid in excess of $50,000 must contain on the outside of the envelope the contractors current certificate of responsibility number, and no bid shall be opened or considered unless this number appears on the outside of the envelope or unless a statement is included on the outside of the envelope indicating that the bid enclosed does not exceed $50,000. Bids may be held up to 90 days from the date of opening for review of bids and qualifications of bidders prior to Contract award. The City of Saltillo, MS reserves the right to reject any or all bids or to waive any informalities in the bidding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents