Similar Projects
First Street Gateway - City of Casper
Infrastructure
Conception
$1,621,000 CJ est. value
Casper, WY 82601

First Street Gateway - City of Casper
Infrastructure
Conception
$1,621,000 CJ est. value
Casper, WY 82601

Casper City Hall Project S.A.F.E. Building Remodel
Addition, Build-out, Renovation, Infrastructure - 70,000 SF
Design
$4,250,000 CJ est. value
Casper, WY 82601

ITS Communication Tower Installation - Casper
Infrastructure
Bidding
$50,000 CJ est. value
Casper, WY 82601

Plug and Abandon Water Wells Casper
Infrastructure
Bidding
$25,000 CJ est. value
Casper, WY 82604

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Installation of New Parking Lot Lighting and Enhancement of Current Building Lighting; Air Traffic Control Tower
Infrastructure
Post-Bid
$60,000 CJ est. value
Casper, WY 82604

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Poplar Street between CY and Collins Drive - City of Casper
Infrastructure
Conception
$1,200,000 CJ est. value
Casper, WY 82601

Sludge Management Project
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Arminto, WY 82630

Crack Seal
Infrastructure
Results

Poplar Street between 25th and 29th Streets - City of Casper
Infrastructure
Conception
$2,000,000 CJ est. value
Casper, WY 82601

Last Updated 08/29/2022 05:36 PM
Project Title

2022 Platte River Trails Replacements

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Platte River Trails Replacements Description of Work: 1,500 linear feet of 10 wide concrete pathway with base course. The bids will be tabulated by the City Manager, or his or her Designee, at the above stated time and place, unless an alternative site is designated in writing prior to the time of Bid Opening. No bid may be withdrawn for a period of thirty (30) days after the date set for opening thereof. The City of Casper, Wyoming, reserves the right to reject any or all bids and to waive any informalities or technicalities in the bidding; provided, however, that any bid received after the time specified or without accompanying Bid Guaranty, as stated below, will not be considered. A Bid Guaranty in the form of a properly executed Bid Bond payable to the City in the amount of not less than 5% of the total base bid amount must accompany each online bid in the form of a scanned electronic copy. (NOTE: If your bid is less than $150,000.00 you may submit a Cashier's Check for not less than 5% of the total base bid amount.) The successful Bidder will be required to deliver the hardcopy Bid Guaranty within five (5) business days. The successful Bidder will be required to execute an Agreement with the City, in the form supplied in the bidding documents, within thirty (30) days after Notice of Award is issued. The Notice of Award shall serve as notice that the Agreement is ready for execution. The Bid Guaranty shall be forfeited as liquidated damages if the Bidder fails to execute the Agreement within thirty (30) days after such Notice is issued, or fails to provide proper Bond or other form of Guaranty, as approved. The Bid Guaranty, if a Bid Bond, shall be executed by a surety or guarantee company authorized to do business in Wyoming. The Attorney in Fact who executes the Bond on behalf of the surety shall affix a certified and current copy of its Power of Attorney from the surety. No other type of Bid Guaranty will be accepted. The City may proceed against a Bid Guaranty unless either: a) the Agreement has been executed by Contractor and Performance, and Labor and Material Payment Bonds have been furnished, as required; or, b) the specified time has elapsed so that Bids may be withdrawn; or, c) the Bid has been rejected. Notice is hereby given that preference will be granted to Wyoming contractors, subcontractors, laborers, and materials, supplies, equipment, machinery, and provisions produced, manufactured, supplied, or grown in Wyoming, as required by W.S. Section 16 6 101 et seq.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents