Similar Projects
McKelvey Road Resurfacing and Sidewalks - Phase 1
Infrastructure
Bidding
Maryland Heights, MO 63043

Conway Park Path Improvements Project
Infrastructure
Bidding
Creve Coeur, MO

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Parks Parking Lots and Trail Sealing
Results
Maryland Heights, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Saint Vincent Greenway: Trojan Park to Robert L. Powell Place
New Construction, Infrastructure
Post-Bid
Saint Louis, MO 63133

Longview Farm Pedestrian Guard Rail Replacement
Infrastructure
Results
Saint Louis, MO 63141

Glengrove Drive and Glenridge Drive Sidewalk Project
Infrastructure
Post-Bid
Maryland Heights, MO 63043

2021 Downtown Parking Lots and Alley Asphaltic Concrete Overlay
Infrastructure
Results
Kirkwood, MO

Repavement of the Streetscape and Flag Pole Installation at the Justice Center
Infrastructure, Alteration
Post-Bid
Clayton, MO 63105

Seton Hall Exterior Ramp
Infrastructure
Results
Saint Louis, MO

Great Rivers Greenway Connector Project Part A
Infrastructure
Post-Bid
$3,000,000 est. value
Brentwood, MO 63144

Selective Slab Replacement
Infrastructure
Results
Green Park, MO 63123

Last Updated 11/11/2021 05:14 PM
Project Title

Installation of a Walking Track

Physical Address View project details and contacts
City, State (County) Overland, MO   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes: Grade and excavate down 6 inches and haul in 1” minus for a 2 inch compacted base. Saw cut for expansion joints. Install expansion joints every 20 feet. Haul of Debris. Back fill the walkway and seed and straw. Must have ADA walkway installed from paved parking lot to walkway. Construct a 12 X 12 foot pavilion on existing concrete pad. Contractor to provide all permits and inspections.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents