Similar Projects
Water Meters 2021
Term Contract
Post-Bid
Lorain, OH

Distribution Materials 2021
Post-Bid
Lorain, OH 44052

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Avon Lake Regional Water Annual Water Distribution and Supplies Bid 2021-2022
Infrastructure
Post-Bid
Avon Lake, OH

West River Road Watermain Improvements Project
Results
Elyria, OH 44035

Nova 8 Inch Transmission Water Main Extension Contract 98
Infrastructure
Post-Bid
Lagrange, OH

Hampshire Farms - Underground Utilities
Infrastructure
Results
Amherst, OH

2020 Hydrant Replacement
Results
$420,000 est. value
North Ridgeville, OH 44039

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Stoney Ridge Road Water Main Replacement
Results
$1,000,000 est. value
North Ridgeville, OH 44039

Lead Service Line Replacements Phase 2
Infrastructure
Results
Elyria, OH

Lead Service Line Replacements Project Phase 1
Results
Elyria, OH

Sheffield Lake Community Road Watermain and Roadway Rehabilitation Project
Results
Less than $349,602 est. value
Elyria, OH 44035

Water and Distribution Supplies
Post-Bid
Avon, OH 44011

Mechanic Street, Crook Street Improvements Phase 1
Results
Less than $700,475 est. value
Grafton, OH 44044

Last Updated 10/26/2021 09:59 AM
Project Title

Mills Creek Condo Water Main Rehabilitation

Physical Address View project details and contacts
City, State (County) North Ridgeville, OH   (Lorain County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include all labor and equipment required to rehabilitate approximately 1,500 linear feet of six inch (6”) water main by either installing a cured-in-place-pipe (CIPP) liner or replacing the existing water main with a new six inch (6”) water main. Work also includes installing 960 linear feet of new eight inch (8”) water main using a trenchless construction method; replacing all hydrants and water valves; and performing other ancillary work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents