Similar Projects
2022 WRF Improvements
New Construction, Renovation, Addition - 1,282 SF
Bidding
Knoxville, IA

Wastewater Treatment System Improvements
Renovation
Bidding
$2,065,500 est. value
Earling, IA

Slater WWTP Improvements
Renovation
Post-Bid
Less than $6,000,000 est. value
Slater, IA

Iowa Wastewater Treatment Facility 2021
New Construction
Post-Bid
$1,805,000 est. value
Miles, IA

WWTF Improvements UV Disinfection
Renovation
Results
Walford, IA

WRF Primary Sludge Piping Replacement - 2021
Renovation
Results
Less than $1,275,000 est. value
Des Moines, IA 50317

Wastewater Treatment System Upgrade
Renovation
Bidding
Riverside, IA

Proposed Wastewater Improvements
Renovation
Post-Bid
$987,000 est. value
Columbus Junction, IA

Earlham Lagoon Upgrades
Renovation
Results
Earlham, IA

Wastewater Treatment Facility Improvements
Renovation
Bidding
West Branch, IA

Wastewater Treatment Plant Improvements 2021 - Aerobic Digester No. 1 Replacement
Renovation
Results
Fairfield, IA 52556

WRF Aeration Basin Sensor Improvements
New Construction
Results
Less than $1,588,000 est. value
Des Moines, IA 50317

Wastewater Treatment Plant Improvements 2020
Renovation
Results
$9,100,000 est. value
Jesup, IA

Influent Rake and Screen Replacement
Renovation
Results
$1,800,000 est. value
Iowa City, IA 52240

WWTF Clarifier Improvements
Renovation
Results
Milford, IA

Last Updated 02/16/2022 03:39 AM
Project Title

Wastewater Treatment Facility Improvements

Physical Address View project details and contacts
City, State (County) Fort Atkinson, IA   (Winneshiek County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major components of the Work include: Construction of a 4-cell controlled discharge lagoon and associated construction consisting of, but not limited to, the following approximate quantities: Imported Fill 60,000 CY Excavation/Embankment of On-site Materials 50,000 CY Synthetic Liner 80,100 SY Force Main, 6” 2000 LF Outfall Line, 12” 650 LF UV Disinfection System 1 EA Electrical Work 1 EA Generator 1 EA Associated Restoration 1 EA

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents