Similar Projects
Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Beverage Park - Manna Capital Partners Manufacturing Facility
New Construction, Infrastructure - 1,700,000 SF
Conception
$600,000,000 CJ est. value
Montgomery, AL 36104

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

New Fire Station No. 10
New Construction, Infrastructure - 22,000 SF
Bidding
$8,000,000 CJ est. value
Montgomery, AL 36108

Widen, Level, Resurface and Traffic Stripe Various County Roads
Infrastructure
Bidding
$200,000 CJ est. value
Montgomery, AL 36104

RSA Annex Project Phase 1 Sitework
Infrastructure
Post-Bid
Montgomery, AL

RFQ D/B - West Alabama Highway Design -Build Project
Infrastructure
Post-Bid
$775,000,000 CJ est. value
Montgomery, AL 36104

Planing, Resurfacing, and Traffic Stripe on CR-61 (Hobbie Road)
Infrastructure
Results
$1,379,590 CJ est. value
Montgomery, AL 36105

Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31)
Infrastructure
Results
$2,499,649 CJ est. value
Montgomery, AL 36108

Planet Fitness
Renovation - 36,116 SF
Construction
Montgomery, AL 36116

Motley Drive Townhouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montgomery, AL 36110

Hyundai Motor EV Battery Manufacturing Plant
New Construction, Infrastructure - 450,000 SF
Pending Verification
$205,000,000 CJ est. value
Montgomery, AL 36105

Squadron Operations Building Addition and Alteration
Addition, Demolition, Renovation, Infrastructure - 4,603 SF
Design
$5,000,000 CJ est. value
Montgomery, AL 36108

Sports Field Plaza Addition Pike Road High School
Addition, Demolition, Infrastructure
Bidding
Pike Road, AL 36064

Last Updated 01/04/2023 12:36 PM
Project Title

New Recreation Center - City of Montgomery

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36104   (Montgomery County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of January 7, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents