Similar Projects
Andover Municipal Parking Hub - Town Hall Andover
Infrastructure
Conception
$350,000 CJ est. value
Andover, CT 06232

Demolition of Operators Quarters Building and Installation of Underground Utilities, Mansfield Hollow Lake, Mansfield Center
Demolition, Infrastructure
Design
$250,000 CJ est. value
Mansfield Center, CT 06250

Tolland Fire Department Replacement of Stations - 440
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$5,000,000 CJ est. value
Tolland, CT 06084

Rotary Upgrade to a Modern Roundabout and Traffic Signal and Railroad Upgrades on Spring Street
Infrastructure
Bidding
$5,000,000 CJ est. value
Stafford Springs, CT 06076

RFQ D/B - Mansfield Apartments Redevelopment
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Storrs Mansfield, CT 06268

RFQ Construction Manager at Risk - South Campus Infrastructure
New Construction, Renovation, Infrastructure
Post-Bid
$62,500,000 CJ est. value
Storrs Mansfield, CT 06269

Tolland Fire Department Replacement of Fire Station 340
Demolition, New Construction, Infrastructure - 4,600 SF
Post-Bid
$1,600,000 CJ est. value
Tolland, CT 06084

Mansfield Elementary School
New Construction
Results
Mansfield, CT 06250

Tasker Retaining Wall Replacement
Infrastructure
Results
$798,863 CJ est. value
Storrs Mansfield, CT 06269

Windermere Elementary School Renovation and Expansion
Build-out, Renovation
Pending Verification
$56,000,000 CJ est. value
Ellington, CT 06029

New Softball Complex - Miller Richardson Park - Town of Coventry
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Coventry, CT 06238

Public Works Facility - Town of Hebron
New Construction, Infrastructure - 17,800 SF
Design
$8,000,000 CJ est. value
Hebron, CT 06248

Henry Park Horowitz Pool
Infrastructure
Bidding
$60,000 CJ est. value
Vernon Rockvl, CT 06066

Clay Sewer Pipe Relining Phase 6
Infrastructure
Post-Bid
$300,000 CJ est. value
Storrs Mansfield, CT 06269

RFQ D/B - South Campus Residence and Dining Halls
New Construction, Infrastructure - 246,000 SF
Results
$169,260,739 CJ est. value
Storrs Mansfield, CT 06269

Last Updated 11/22/2022 03:17 PM
Project Title

Construction Management Services

Physical Address View project details and contacts
City, State (County) Ellington, CT 06029   (Tolland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $61,640,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Ellington is seeking qualifications and proposals from qualified firms to provide Construction Management-At-Risk (CMR) services in connection with the Renovate-to-New, Extension/Alteration project for the Windermere Elementary School (the "Project"). This solicitation is both a request for qualifications and a request for proposals ("RFQ/RFP"). Interested and qualified parties who have demonstrated their ability at comparable work are invited to submit qualifications and proposals. No proposal may be withdrawn for a period of ninety (90) days after opening of the same without approval and written consent of the Town of Ellington. The Town of Ellington reserves the right to amend or terminate this Request for Qualification & Proposal, to reject any or all qualifications & proposals, to waive any informalities, omissions, excess verbiage or technical defects in the qualification or proposal, and the Town need not necessarily award the contract to the lowest proposer if, in the opinion of the Town, it would be in the best interest of the Town of Ellington to accept another qualification or proposal because of the greater expertise, experience, resources, efficiency or familiarity with the Town of the proposer. The approximate construction budget for this Project for planning purposes is as follows: Construction cost (Target GMP): Approx. $51,000,000 (including all environmental conditions) In its final form, the school will serve a Pre-Kindergarten through Grade 6 population of approximately 739 students and will total approximately 95,000 square feet. The total Project cost, inclusive of soft costs, is $61,640,000. Respondents are hereby notified not to contact any member of the PBC or Town / School District staff and its elected officials, except as provided herein regarding this RFQ/RFP. All questions about the RFQ/RFP should be directed to Kelly Nelli, Project Manager, by email at kelly.nelli@arcadis.com by October 26, 2022. Answers to all received questions will be sent to all Respondents attending the mandatory pre-bid conference, and posted on the Town website. The CMR shall provide payment and performance bonds from the surety in the amount of 100% of the GMP.

Details

,, 132,000 SF - 95,000 SF. 37,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents