Similar Projects
Reported | 11/20/2021 12:00 AM |
Project Title | J091--Hydraulic Services |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20310 (District of Columbia County) |
Category(s) | Environmental |
Sub-Category(s) | Hazardous Waste Disposal |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall furnish and install all labor; tools and materials necessary to perform the necessary clean ups and repairs cited on the attached report. These systems are required by the District Department of the Environment to be inspected and serviced annually. Procedure will be as follows: • Excavate around the nursing home piping sump, install new conduit penetration. • Install new conduit wiring and leak sensor from the sump to the ATG. • Perform hydrostatic testing of the sump. • Reprogram and calibrate the ATG for the addition of the new leak sensor. • Clean up spilled oil in the BK-100 hydraulic elevator room and properly dispose of materials off site. • Provide and (2) spill kits and training to VA Staff of how to implement in the event of a spill. • Perform a final walkthrough for acceptance of completion • Contractor shall provide the facility with ATG calibration certificates and hydrostatic test report. • Within ten (10) days after award, the Contractor shall provide the COTR with a copy of the procedures that the Contractor shall follow, including the manufacturer specifications, the ones listed in paragraph A, and any additional procedures followed by the Contractor. • The day of the Service must be scheduled by the Field Service Engineer and the Contracting Officers Technical Representative at least a week in advance and during normal working hours. All exceptions to the set schedule shall be arranged and approved in advance. Any charges for materials such as lubricants, fluids, cleaning supplies, parts, services, manuals, tools, or required for the Contractor to successfully complete schedule service shall be provided by the Contractor and are included within this contract, and its agreed upon price. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |