Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

Wood Trace Wastewater Treatment Plant - Phase 2 (0.270 MGD) and Lift Station Number 1 - Phase 2
New Construction
Bidding
TX

RM 2243 WWTP Aeration Phase II Improvements
Renovation
Bidding
$1,125,000 est. value
Leander, TX

Waste Water Treatment Plant Mitigation
Post-Bid
Orange, TX 77630

City of Los Fresnos Wastewater Headworks and Chlorine Contact Chamber Project
Post-Bid
Los Fresnos, TX 78523

Wastewater Bar Screens for Houston Public Works
Results
Houston, TX 77013

Dissolve Air Floatation Unit and Support Replacement
Results
Less than $299,000 est. value
San Antonio, TX 78200

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

New Solid Waste and Recycling Facility
New Construction
Pending Verification
$6,530,000 est. value
Temple, TX

0.5 MGD Wastewater Treatment Plant Improvements and Reclaimed Water System
Renovation
Bidding
$4,950,000 est. value
Spring, TX 77379

Granbury Wastewater Treatment Plant
Post-Bid
$27,000,000 est. value
Granbury, TX 76048

Wastewater Treatment Plant Improvement
Results
Jacinto City, TX 77029

Dallas Salmon Wastewater Treatment Facility
Renovation
Pending Verification
League City, TX

Paw Paw Wastewater Treatment Plant Headworks and Miscellaneous Clarifier Improvements
Renovation
Bidding
$3,100,000 est. value
Denison, TX 75021

Place Digester Basin Grit Removal
Post-Bid
Houston, TX 77025

Last Updated 09/21/2021 11:02 AM
Project Title

El Paso Water Roberto R. Bustamante WWP Headworks Improvements

Physical Address View project details and contacts
City, State (County) El Paso, TX 79927   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes General Conditions, Bond, Insurance, Site Supervision, Safety Measures, Site Preparation, Piping, Demolition, Electrical Demolition, Bypass Pumping, Perimeter Fence, 12-inch Drain Line, Removal of existing T-Lock Liner, Installation of new concrete coating system, 25 LF Concrete Crack Repair, 1,000 sqft of Structural Concrete Rehabilitation including Preparation and Application of Type 1 Repairs (see spec Section 03 01 05 Concrete Modification and Repair), and 500 sqft Type 2 Repairs (see spec Section 03 01 05 Concrete Modification and Repair) including 1 LF of rebar replacement per sqft of Type 2 repair).

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents