Similar Projects
Sabine Neches Waterway PA8 Containment Dike Raise
Design
$1,000,000 to $5,000,000 est. value
TX

Nueva Street Marina Fabridam Replacement
New Construction
Bidding
$435,000 est. value
San Antonio, TX 78275

Lake Dam Improvements
Renovation
Bidding
$7,800,000 to $8,100,000 est. value
Austin, TX 78744

Z2PZ--Rebuilding of Gate 4 Support Systems and Opener at Waco
Post-Bid
Waco, TX 76711

Lower Bois d'Arc Creek Reservoir Dam and Intake Project - Proposal Package 4A CR2700 Improvements
Post-Bid
$750,000 est. value
Honey Grove, TX 75446

Tom Miller Dam Replacement Chains
Results
Less than $175,000 est. value
Austin, TX

Dam Reconstruction at Bastrop State Park
Results
$7,500,000 to $8,300,000 est. value
Bastrop, TX 78602

Elm Creek (Cen-Tex) Watershed – Sites 37, 38 and 43 Repairs
Bidding
$500,000 to $750,000 est. value
Temple, TX

Lower Bois D`Arc Creek Reservoir Dam and Intake Project - Proposal Package 3 Reservoir Cleanup
Post-Bid
$750,000 est. value
Honey Grove, TX 75446

Lane City Dam Interim Stabilization
Results
Lane City, TX 77453

Sister Grove Regional Water Resource Recovery Facility Outfall Pipeline 1 - Solicitation Set 01 - Large Diameter Tunnel Work and Large Diameter Pipe Materials
Post-Bid
TX

Houston Ship Channel, Mid Bay Placement Area (PA) Improvements
Results
$5,000,000 to $10,000,000 est. value
TX 77571

LBCR Dam and Intake Project - Proposal Purchase Package 6B - Barrier and Warning System
Post-Bid
$350,000 est. value
Honey Grove, TX 75098

Houston Ship Channel, Texas, Clinton Placement Area Improvements in Harris County, Texas
Results
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

Lake Ralph Hall: Leon Hurse Dam
Post-Bid
$135,000,000 to $165,000,000 est. value
TX

Reported 11/30/2019 12:00 AM
Project Title

Construction: Lewisville Spillway

Physical Address View project details and contacts
City, State (County) Lewisville, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope Summary: Measures to address the structural stability concerns associated with post-tensioned anchors installed through the ogee weir, and an upstream geomembrane blanket. The design will continue to be refined in FY20, but at this time consists of 99 anchors installed to a depth of 70 ft. A work platform or rail system will be required to install the anchors along the downstream slope of the monoliths. The upstream geomembrane blanket will be installed in the approach channel of the spillway below the current grade and attached to the ogee monoliths. The membrane will extend upstream and be covered with the material removed for its installation. The apron slab overlay will install apron slabs over the existing apron slabs to address uplift and sliding concerns. Each overlay slap will have anchors installed, however the number of anchors varies depending on the distance from the ogee weir.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents