Similar Projects
Nottingham Park Improvements
New Construction, Infrastructure - 3,400 SF
Design
$10,000 CJ est. value
Avon, CO 81620

2022 Dog Park at Buckhorn Valley
Infrastructure
Design
$180,000 CJ est. value
Gypsum, CO 81637

Donovan Park Landscape Modifications
Infrastructure
Bidding
$500,000 CJ est. value
Vail, CO 81657

Bus Shelters Pad Construction Contract
Infrastructure
Bidding
$800,000 CJ est. value
Avon, CO 81620

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

White River National Forest Road and Bridge Construction and Maintenance IDIQ (Rbcm Idiq) Construction and Service Contract Is To Provide for Road and Bridge Construction and Maintenance On The White
New Construction
Results
$2,500 to $5,000,000 est. value
Gypsum, CO 81637

Ford Park Pedestrian Bridge Rehabilitation
Infrastructure
Results
$100,000 to $150,000 est. value
Vail, CO

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

West Vail
Infrastructure
Bidding
$600,000 CJ est. value
Vail, CO 81657

Midland Avenue Streetscape Project
Infrastructure
Post-Bid
Basalt, CO 81621

Bridge Replacement of The Gypsum Creek Bridge on Cottonwood Pass Road
Infrastructure
Results
$430,607 est. value
Eagle, CO

Willits Condominium Development
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Basalt, CO 81621

Midland Avenue Streetscape Project - Town of Basalt
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Basalt, CO 81621

Last Updated 09/14/2022 05:33 AM
Project Title

Milk Creek Timber Bridge Deck Replacement

Physical Address View project details and contacts
City, State (County) Wolcott, CO 81655   (Eagle County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

BLM-CO Milk Creek Timber Bridge Deck Replacement This is a request for quotes for a timber bridge deck replacement, water bars and sediment removal in accordance with the attachments near Wolcott, CO. The Government estimates the magnitude of this project to be under $25,000. Note: Based upon further inspections and recommendations next week, there is a good possibility of an amendment line for the hauling, delivery and placement of Government furnished rip-rap and concrete work around the piers to protect from further scouring problems. Basic Contracting Requirements: 1. Active Registration - www.sam.gov 2. Invoicing and Payment - www.ipp.gov 3. FAR Part 36 Construction Provisions and Clauses 4. FAR Part 13 Simplified Acquisition Procedures 5. Davis Bacon Act Wages for Eagle County, CO 6. Total Small Business Set-Aside - NAICS 237310 Size Std:$39.5M 7. Basis of Award - Low Price Technically Acceptable 8. Contract Type: Firm Fixed Price Minimum Requirements for Responsive Quote: 1. Filled out, dated, priced, Signed - SF1442 including Section B - Schedule of Items 2. Technical Response detailing your recent and relevant experience with projects of similar size and scope, resources, product descriptions, safety plan and schedule for accomplishing this work within the period of performance. Please include at least 3 contactable references who can attest to your responsibility to perform this project. POC: Contracting Officer Robert Hall - rhall@blm.gov - 970-876-9038 2__1_0_______ calendar days Period of Performance: 09/19/2022 to 05/05/2023

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents