Similar Projects
Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Rehabilitate Runway - City of Elkhart
Infrastructure
Design
$250,000 est. value
Elkhart, IN 46514

Intersection Improvement
Infrastructure
Bidding
$585,000 CJ est. value
Elkhart, IN 46516

Intersection Improvement
Infrastructure
Bidding
$585,000 CJ est. value
Elkhart, IN 46516

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021-1 Community Crossing Resurfacing
Infrastructure
Post-Bid
Millersburg, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

County Road 4 Extension Between County Roads 17 and 19: Clearing and Grading
Infrastructure
Results
Goshen, IN

Bike / Pedestrian Facilities
Infrastructure
Design
$2,878,765 CJ est. value
Goshen, IN 46528

Replace Superstructure - SR 19
Demolition, New Construction, Infrastructure
Bidding
$3,930,316 CJ est. value
Elkhart, IN 46517

2021 Community Crossings
Infrastructure
Post-Bid
Bristol, IN

2022 Concrete Roadway Repair
Infrastructure
Results
Goshen, IN

2023 Street Department Curb Ramp Project
Infrastructure
Bidding
$400,000 CJ est. value
Elkhart, IN 46516

Anan Ulery Tile at CR 38 Relocation
Alteration
Post-Bid
Less than $230,000 est. value
IN

2022 Asphalt Paving
Infrastructure
Results
Goshen, IN

Last Updated 04/03/2023 06:36 PM
Project Title

2023 CCMG Paving Program

Physical Address View project details and contacts
City, State (County) Goshen, IN 46526   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,927,004 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals shall be properly and completely executed on proposal forms furnished by the County in accordance with Revised Indiana Form 96 and shall be accompanied by the Contractor's Financial Statement form taken from Form 96A for any proposal of $5,000 or more. The Contractor shall submit an itemized proposal of the approximate quantities and components of labor and materials to complete the contract. Said proposal shall be upon the standard bid sheets used by Elkhart County, and said sheet must contain an authorized signature of the Contractor, or the bid of the Contractor may, at the discretion of Elkhart County, be rejected and declared invalid. Each proposal shall be accompanied by a non-collusion affidavit as required by the Statutes of Indiana. Bids shall be enclosed in a sealed envelope, bearing the title of the project and name and address of bidder. Bids will be accepted only from bidders who are sufficiently and currently pre-qualified by the Indiana Department of Transportation. Proof of pre-qualifications must be submitted with the bid. A current Contractor's Financial Statement taken from Form 96A and the Indiana Department of Transportation prequalification certificate may be placed on file with the Board of County Commissioners of Elkhart County at the Highway Division annually in lieu of executing these documents for each project. All work may begin on April 3rd, 2023 and shall be completed by September 29th, 2023. Delays in completion beyond that date shall result in liquidated damages levied against the Contractor by Elkhart County. The damage charges shall be one thousand dollars ($1000) per calendar day beyond the above stated date and any intermediate completion dates noted in the specifications. A satisfactory bid bond (10% of bid), payable to the Board of County Commissioners of Elkhart County, Indiana executed by the bidder shall be submitted with each bid. No bids shall be withdrawn after the opening of the bids without the consent of the Board of Commissioners of Elkhart County for a period of thirty (30) days after the scheduled time of closing. Said work shall be subject to all the provisions of the plans and specifications therefore herein above referred to including the completion date thereof and penalty clause as therein set forth.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents