Similar Projects
Site 45-M-SE-2 Middle School
New Construction
Conception
$46,700,000 est. value
Orlando, FL 32827

Lake Mary Elementary School Renovation
Renovation
Conception
$16,770,000 est. value
Lake Mary, FL 32746

Carrollwood Day School Center for Innovation
New Construction - 42,605 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Tampa, FL 33613

James Marlowe Elementary School
New Construction, Renovation
Design
$5,000,000 est. value
New Port Richey, FL 34652

Construction Management Services for Facilities Renovation and Repair a Golden Grove
Renovation
Bidding
$4,595,077 est. value
West Palm Beach, FL 33411

Peters Elementary School- Smart Program Renovations
Renovation
Bidding
$4,000,000 to $6,000,000 est. value
Plantation, FL 33317

Rutledge Pearson Elementary School
New Construction
Sub-Bidding
Jacksonville, FL 32208

Citrus Cove Elementary School Core Expansion
Post-Bid
Less than $2,690,000 est. value
Boynton Beach, FL 33436

Deerfield Beach Elementary School - Smart Program Renovations
Post-Bid
$3,777,000 est. value
Deerfield Beach, FL 33441

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

Summers Elementary School Kitchen Renovations and Roof Replacement
Renovation
Results
Less than $1,017,877 est. value
Lake City, FL 32025

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Witt Elementary School Renovation and Addition
Renovation, Addition
Construction
$17,000,000 est. value
Bradenton, FL 34212

K-8 "FF" Minneola Area Capacity Construction
Addition
Pending Verification
$38,500,000 est. value
Minneola, FL

Lake Hills Academy North Addition
Addition
Pending Verification
$2,200,000 est. value
Howey-in-the-Hills, FL 34737

Last Updated 03/02/2022 03:16 PM
Project Title

Mims Elementary School Cafetorium

Physical Address View project details and contacts
City, State (County) Mims, FL 32754   (Brevard County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Div. 2 Fencing Div. 3 Tilt Up Concrete Div. 9 Gyp. Board Assemblies LVT Flooring Acoustic Ceilings Painting Div. 8 Doors/Frames Hardware Alum Storefronts Div. 10 Signage & Lockers Aluminum Canopies / Protective Coverings Div. 21 Fire Sprinkler

Details

Elementary School, 13,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents