Similar Projects
Local Road Improvement
Infrastructure
Post-Bid
$180,000 CJ est. value
Turtle Lake, WI 54889

Local Road Improvement
Infrastructure
Post-Bid
$180,000 CJ est. value
Turtle Lake, WI 54889

Superior Cosmetology Remodel
Renovation, Addition
Results
Rice Lake, WI 54868

Pulverizing
Infrastructure
Results
Chetek, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arrowhead Family Dental Expansion
Addition, Demolition, Infrastructure - 815 SF
Pending Verification
$500,000 CJ est. value
Rice Lake, WI 54868

2022 Road Work
Infrastructure
Post-Bid
$400,000 est. value
Almena, WI

Paving
Infrastructure
Results
Chetek, WI

Cedarcrest Ambulatory Surger Center and Clinic BP#2
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Rice Lake, WI 54868

Local Road Improvement Program Project
Infrastructure
Post-Bid
$400,000 est. value
Rice Lake, WI

McKinley - Rice Lake, STH 25 to West Avenue
Infrastructure
Results
$2,000,000 to $2,999,999 est. value
Rice Lake, WI 54868

Gravel on 4th Street
Infrastructure
Construction
$70,000 CJ est. value
Vance Creek, WI 54762

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Chetek Wastewater Treatment Facility
Demolition, New Construction, Renovation, Infrastructure
Results
$19,942,000 CJ est. value
Chetek, WI 54728

Last Updated 02/19/2024 03:01 AM
Project Title

Northwood Technical College Rice Lake Office Renovation

Physical Address View project details and contacts
City, State (County) Rice Lake, WI 54868   (Barron County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) College/University, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $1,514,773 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**Versacon requests bids by 12:00 PM on February 27, 2024. In general, the Project consists of interior and exterior renovations to a higher education building. Facility construction work includes concrete, salvaged brick masonry, steel stud framing, insulation, EPDM roof patching, concrete waterproofing, hollow metal, flush wood doors, aluminum storefront, acoustical ceilings, resilient flooring, tile carpeting, metal façade building signage, and painting. Plumbing work includes installing a lavatory. HVAC work includes replacement of cabinet unit heater, return grilles, diffusers, and dampers. Electrical work includes renovation of lighting, data, power, fire alarm, emergency systems, door access, and exterior lighting. Site work includes removal of paving, concrete paving, light pole bases. Bid Security in the amount of ten percent of the maximum amount of the Bid must accompany each Bid as described in the Project Manual, Instructions to Bidders. A mandatory pre-bid meeting will be conducted by the Owner and Architect/Engineer to answer questions and to enable bidders to examine conditions at the Project Site. The Owner reserves the right to waive irregularities and to reject any or all Bids. Bids may only be withdrawn in accordance with the Project Manual, Instructions to Bidders. The bids will be opened publicly at the Rice Lake campus conference center and read aloud at 2:00 pm February 27, 2024. The bid opening will also be presented via tele-conference, see link: Microsoft Teams meeting Join on your computer, mobile app or room device. https://teams.microsoft.com/l/meetup-join/19%3ameeting_MmI2Mjg5OTItYTVlZC00MDZmLWE0YjItNTUwYWVlMTFkODRl%40thread.v2/0context=%7b%22Tid%22%3a%22a22a4ff1-892a-44ee-8725-a5114f07c7ce%22%2c%22Oid%22%3a%226c89424e-0c9f-42c9-b4a7-f2c5e93885be%22%7d Meeting ID: 213 256 817 260 Passcode: ByLvsJ Or call in (audio only) +1 929-229-5751,,339375123# United States, New York City Phone Conference ID: 339 375 123#

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents