Similar Projects
Installation of Drainage City Wide
Post-Bid
Woonsocket, RI

Pipes, Castings and Erosion Controls
Post-Bid
Coventry, RI 02816

Johnson Road Culvert Head Wall Replacement Project
Results
Less than $88,865 est. value
Foster, RI 02825

Repair of North Bulkhead at the Port of Galilee - Bond
Results
Providence, RI

Greenhouse Wash Water Management
Post-Bid
North Kingstown, RI 02852

Drainage Improvements at Lugent Lane
Results
Less than $62,334 est. value
Bristol, RI 02809

Supply of Drainage Pipe
Post-Bid
Woonsocket, RI

Supply of Drainage Pipe
Results
Woonsocket, RI

High Density Polypropylene Pipe
Term Contract
Post-Bid
Warwick, RI

Independence Park Seawall Improvements
Results
Charlestown, RI

2019 Statewide Drainage Repairs, C-1
Results
Johnston, North Providence, RI

Sidewalk, Road and Drainage Construction
Term Contract
Results
Providence, RI

Design/Build for Replacing the S. Broadway 72" Diameter Steel Culvert
Results
East Providence, RI

High Density Polypropylene Pipe
Term Contract
Results
Warwick, RI

Drainage Improvements Putnam Pike
Results
Glocester, RI

Last Updated 11/06/2019 07:43 AM
Project Title

Drainage Improvements to Opechee Drive, Alves Street and Berry Lane

Physical Address View project details and contacts
City, State (County) Bristol, RI 02809   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the installation of new catch basin and drainage manhole along Opechee Drive as shown on the construction plan prepared by Caputo and Wick LTD., dated September 2019. In addition, the scope of work includes the installation of catch basins and new drainage pipe along Alves Street and Berry Lane as shown on the plan prepared by BETA Group, dated 10/10/2019. The Contractor will be responsible for verifying the location of all utilities above and below the surface and for obtaining a Dig Safe permit. The project includes saw cutting the existing bituminous pavement, removing and legally disposing the existing pavement, excavating and installing new HDPE drainage pipe, catch basins, drainage manhole, backfilling and compacting the trenches with approved gravel borrow, and installing a bituminous temporary trench patch; and after a suitable settlement period of approximately 60 days, saw cutting the existing bituminous pavement to provide a straight edge between structures, removing the temporary bituminous trench patch, install a new 2 ½” bituminous binder course and a new 1 ½” surface course, 6” loam and seeding where necessary, and any incidentals necessary to complete the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents