Similar Projects
The Legacy Events Center Campus Re-Development and Remodel
Renovation
Conception
Farmington, UT 84025

Seasons Amenities
New Construction - 1,660 SF
Design
$500,000 to $1,000,000 CJ est. value
Garden City, UT 84028

Alloy Fitness
Build-Out - 1,655 SF
Post-Bid
$200,000 est. value
Highland, UT 84003

Pickleball Complex Project - 2022
New Construction, Infrastructure - 55,000 SF
Post-Bid
$400,000 to $600,000 est. value
Cedar City, UT

Construction New Cyprus High School-Phase II
New Construction
Results
Magna, UT 84044

DFCM Construction-VBS Construction-UTNG Nephi Readiness Center
New Construction - 54,300 SF
Results
$16,100,000 est. value
Salt Lake City, UT

Bernie Summer Camp Activities Center & Outdoor Athletic Complex
New Construction - 9,300 SF
Construction
$4,500,000 est. value
Salt Lake City, UT 84113

Reach Higher Performance Center
New Construction - 28,783 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84770

Sommer Sports Complex
New Construction - 12,960 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Herriman, UT 84096

Lehi Indoor Tennis & Pickleball
New Construction
Pending Verification
Lehi, UT 84043

Construction of the Maple Mountain High School Field Upgrade
Renovation
Post-Bid
Spanish Fork, UT 84660

SLCC Jordan Campus Cate Field Improvements
Renovation
Results
$4,500,000 est. value
West Jordan, UT 84084

Vista View
New Construction
Construction
Spanish Fork, UT 84660

Lehi Tennis Club
New Construction
Pending Verification
Lehi, UT 84043

Duchesne High School & Sports Complex
Renovation
Post-Bid
$50,000,000 est. value
Duchesne, UT 84021

Reported 07/14/2022 09:05 AM
Project Title

Logan High School Athletics Remodel

Physical Address View project details and contacts
City, State (County) Logan, UT 84321   (Cache County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing track surface and replacing with new track surface, including repairs to the asphalt track base as needed during removal of the old surface. Site enhancements will be made to walks and landscape at the northeast side to prevent future water from ending up on the track. Demolition of the existing concessions and restroom, capping water and sewer, as well as a new restroom and concession in a new location south of the stadium. Improvements will include new concrete walks to enhance user experience. The existing press box will be removed and replaced with a new four room press box with new sound system and shade cover on the top deck. Other site improvements include enhancements to the open space field east of the baseball field.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents