Similar Projects
SR 61 over Lick Run
Infrastructure, Renovation
Conception
$910,000 CJ est. value
Shamokin, PA 17872

SR 61 over Lick Run
Infrastructure, Renovation
Conception
$910,000 CJ est. value
Shamokin, PA 17872

SR 147 from Blacksmith Hill St to Toad Valley Road
Infrastructure
Design
Dalmatia, PA 17017

SR 1007 over Tributary of Warrior Run Creek
Demolition, New Construction, Infrastructure
Design
$366,621 CJ est. value
Turbotville, PA 17772

SR 405 over Tributary to Susquehanna River
Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Milton, PA 17847

SR 405 over Tributary to Susquehanna River
Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Milton, PA 17847

Demolition of Blighted Structures
Demolition, Infrastructure
Post-Bid
$25,000 est. value
Shamokin, PA 17872

Paving Contract
Infrastructure
Post-Bid
Trevorton, PA

Seal Coat Contract
Results
Watsontown, PA

Clemens Road Reconstruction Project
Infrastructure
Results
$110,010 CJ est. value
Delaware Township, PA 17777

Encina Point Township Circular Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$1,100,000,000 CJ est. value
Northumberland, PA 17857

SR 4018 over Indian Sprng
New Construction, Demolition
Conception
$450,000 est. value
Sunbury, PA 17801

SR 147 (CSVT Gap) from Eighth St to SR 405
Infrastructure
Design
$1,740,000 CJ est. value
Northumberland, PA 17857

Parking Lot Repair at Mount Carmel Office and Milton Tower
Infrastructure
Bidding
$300,000 CJ est. value
Milton, PA 17847

Warsaw Street Paving Project
Infrastructure
Post-Bid
Marion Heights, PA

Last Updated 02/20/2023 08:12 AM
Project Title

SR 3003 over Mouse Creek

Physical Address View project details and contacts
City, State (County) Washington Township, PA 17823   (Northumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2026
Bids Due View project details and contacts
Estimated Value $1,130,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SR 3003 over Mouse Creek in Jordan Township Northumberland County Primary Improvement Type: Bridge Improvement As of February 20, 2023, the project is Future development stage. Anticipated letting date is September 01, 2026. PennDOT - SR 3003 over Mouse Creek *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents