Similar Projects
Biddle Point Pump Station Improvements
Renovation
Bidding
$2,750,000 est. value
Mackinac Island, MI

Nine Mile Pump Station - CMAR Services
Renovation
Bidding
MI

Birchcrest Estates MHC - Lift Station Replacement
Renovation
Post-Bid
Niles, MI 49120

Replacement Of Submersible Pumps At 4 Lift Stations -Alpena Combat Training Center
Renovation
Post-Bid
Alpena, MI

Cyl-Tec Pump Station Replacement
Results
Tecumseh, MI

Wastewater Treatment Plant Upgrades - Screw Pump #3
Results
Mount Pleasant, MI 48858

Lewis Street Lift Station Pumps
Renovation
Bidding
Jackson, MI

Pump Station Replacement
Post-Bid
Oscoda, MI

Sewer Lift Station Replacement Project
Results
Gladwin, MI

Summit Street Booster Station Refurbishment
Renovation
Bidding
Brighton, MI

Brye Road Booster Station Improvements
New Construction
Post-Bid
Ludington, MI

CSO Pump Station and RTB Improvements Project
Results
East Lansing, MI

West Oaks Sewer Replacement and Pump Station Abandonment
Renovation, Alteration
Bidding
$530,000 est. value
Novi, MI

Lake Michigan College Lift Station
Demolition, Infrastructure
Post-Bid
Benton Harbor, MI

Assessment of Pump Stations
Term Contract
Results
Less than $17,548 est. value
Brighton, MI 48114

Reported 01/21/2022 12:00 AM
Project Title

Walnut Lake #3 Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Oakland, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of certain facilities and structures, including the following approximate quantities: Refurbishment of Walnut Lake #3 Lift Station, including abandonment of the existing steel can dry pit, installation of new pumps in an existing wet well, new piping, new utility building and site work, as well as electrical and controls replacement and upgrades

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents