Similar Projects
Last Updated | 04/16/2021 04:24 AM |
Project Title | Resurface (Asphalt) US-83: From 6.25 Miles North of the Sh-3 Junction, Extend North Near Turpin |
Physical Address | View project details and contacts |
City, State (County) | Turpin, OK (Beaver County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Section 0001 - Roadway - Stp-204b(036)3p 0010 202(d) 0184 Unclassified Borrow 900.00 Cy 0020 202(h) 0185 Earthwork 1.00 Lsum 0030 407(c) 0301 (Sp) Polymer Modified Cationic Rapid Set - 1s 41,500.00 Gal 0040 410(a) 6530 (Sp)Hot-In-Place Recycled Asphalt Concrete 116,000.00 Sy 0050 410(b) 6540 (Sp)Hot-In Place Asphalt Emulsion 290.00 Ton 0060 411(c) 5960 Superpave, Type s4(Pg 64-22 Ok) 14,025.00 Ton 0070 413(a) 4870 Rumble Strip-Centerline Hma-Con 30,000.00 Lf 0080 413(b) 4863 Rumble Strip-Method Hma-Cyc 60,100.00 Lf Section 0003 - Roadway - Stp-204b(037)3p 0090 202(d) 0184 Unclassified Borrow 800.00 Cy 0100 202(h) 0185 Earthwork 1.00 Lsum 0110 407(c) 0301 (Sp) Polymer Modified Cationic Rapid Set - 1s 35,200.00 Gal 0120 410(a) 6530 (Sp)Hot-In-Place Recycled Asphalt Concrete 86,000.00 Sy 0130 410(b) 6540 (Sp)Hot-In Place Asphalt Emulsion 215.00 Ton 0140 411(c) 5960 Superpave, Type s4(Pg 64-22 Ok) 11,800.00 Ton 0150 413(a) 4870 Rumble Strip-Centerline Hma-Con 28,000.00 Lf 0160 413(b) 4863 Rumble Strip-Method Hma-Cyc 55,000.00 Lf Section 0002 - Traffic - Stp-204b(036)3p 0170 856(a) 8535 Traffic Stripe(Multi-Poly.)(6" Wide) 104,000.00 Lf 0180 856(b) 8860 Traffic Stripe(Multi-Poly.)(Arrows) 4.00 Ea 0190 880(j) 8700 (Sp) Construction Traffic Control 40.00 Sd Section 0004 - Traffic - Stp-204b(037)3p 0200 856(a) 8535 Traffic Stripe(Multi-Poly.)(6" Wide) 82,000.00 Lf 0210 856(a) 8548 Traffic Stripe(Multi-Poly)(12" Wide) 660.00 Lf 0220 856(b) 8860 Traffic Stripe(Multi-Poly.)(Arrows) 9.00 Ea 0230 880(j) 8700 (Sp) Construction Traffic Control 30.00 Sd Section 0005 - Construction - Stp-204b(037)3p 0240 641 1552 Mobilization 1.00 Lsum |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |