Similar Projects
Floating Dock and Gangway Replacement for Lower Lock and Dam Park
Infrastructure
Results
Rome, GA 30161

Dock Refurbishments at the East River Terminal
Results
Brunswick, GA 31520

Riverside Parkway At Sweetwater Creek Bridge Rehabilitation
Results
Douglasville, GA

Floating Dock and Gangway Repair/Replacement - Brushy Branch Park
Results
Rome, GA 30165

Dry Docking and Repair of the Research Vessel Savannah 2021
Post-Bid
Athens, GA

South River Trail Boardwalk Repair
Results
Decatur, GA 30030

Purchase and Installation of Aluminum Piers
Results
Lawrenceville, GA 30045

Providence Park Improvements
New Construction - 635 SF
Results
$206,731 est. value
Milton, GA 30009

Design-Build Etowah River Park Canoe Launch
Infrastructure
Bidding
Dawsonville, GA 30534

Wells Creek Bridge and ST. Simons Island Fishing Pier Rehabilitation 2021
Results
Saint Simons, GA

Labor to Construct Deck
Post-Bid
Bainbridge, GA 31717

Zonolite Park Boardwalk
Results
Atlanta, GA 30306

Floating Kayak Dock
Results
Less than $25,893 est. value
Hiawassee, GA 30546

GA ERFO NPS CUIS 2017-1(1)
Results
$1,000,000 to $5,000,000 est. value
Saint Marys, GA

Construction of a Wooden Boardwalk along the Small Shops at the District
Infrastructure
Bidding
Morrow, GA 30260

Last Updated 08/10/2021 01:45 PM
Project Title

Berth 1 Fender Replacement

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31523   (Glynn County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of providing all materials, equipment, and labor required to complete the replacement of the Berth 1 fenders at the Colonel’s Island Terminal. Specifically, the project consists of all work required to remove two (2) floating foam filled fenders and four (4) rubber cone fenders with H-pile supported steel frontal panels from the main dock and removal of rubber cone fenders with steel H-pile supported frontal panels from three (3) breasting dolphins, nine (9) fenders in total to be removed. New installation shall consist of ten (10) rubber cone fenders with steel frontal panels (no H-piles).

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents