Similar Projects
Embassy Suites
Renovation
Post-Bid
Washington, DC 20001

31st Street NW Hotel
Renovation
Pending Verification
Washington, DC 20007

Capitol Crossing
New Construction - 20,567 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20260

CitizenM Hotel
New Construction
Pending Verification
Washington, DC 20007

1312 18Th Street NW Inn
New Construction, Addition
Pending Verification
Washington, DC 20544

Arlo Hotel
New Construction, Renovation - 124,000 SF
Construction
$85,000,000 est. value
Washington, DC

Caption by Hyatt - Chinatown, Washington, D.C.
New Construction
Design
$20,550,000 est. value
Washington, DC 20001

20 Massachusetts Avenue
Renovation, Addition - 535,000 SF
Construction
Washington, DC 20001

Westin Washington D.C.
Renovation
Pending Verification
$70,000,000 est. value
Washington, DC 20001

North Capitol And H Streets Hotel & Retail
New Construction - 7,700 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20002

CitizenM Hotel - NoMa
New Construction - 120,824 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20002

Last Updated 06/30/2022 08:53 AM
Project Title

One Washington Circle Hotel Renovation

Physical Address View project details and contacts
City, State (County) Washington, DC 20037   (District of Columbia County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected October 2022, Construction Completion Expected June 2023
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a hospitality development in Washington, District of Columbia. Conceptual plans call for the renovation of a nine-story above grade, 152-room hospitality development. The project scope includes renovation of a hotel with suites rooms averaging 480-square-feet. Scope details have note been released. As of June 29, 2022 the project is planning stage. The property was recently acquired. A building permit application has not been submitted to the District. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is expected to be completed by June 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Hotel/Motel, 9 Stories Above Grade, Renovation, 52 Unit(s).
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents