Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Site Paving
Post-Bid
Elgin, IL 60120

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Sidewalk, Curb
Results
Hanover Park, IL

2021 Street Improvements
Post-Bid
Lincolnwood, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Last Updated 08/25/2022 01:02 AM
Project Title

Upgrade Parking Lots, Roads and Walkways Chicago State University

Physical Address View project details and contacts
City, State (County) Chicago, IL 60628   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $6,988,992 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 29 the project has not yet been awarded. A timeline for award has not yet been established . Improvements to various parking lots, roadways and walkways on the Chicago State University Campus - including HMA roadway, pathway and parking lot pavement removal and replacement, sidewalk removal/regrading/replacement, new underdrains, new ADA signing/striping, curb and gutter removal and replacement, supplemental drainage structures/sewer, and new pavement striping. Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check, cashier's check or bank draft. Refer to Article 00 43 13 of the Standard Documents for Construction. 25% MBE, 5% WBE, 2% VBE/PBE.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents