Similar Projects
Valley Park Complex Upgrades
Renovation
Pending Verification
Ketchikan, AK

2022 William B Lyons Park Improvements
Renovation, Infrastructure
Results
$500,000 est. value
Anchorage, AK

John Weaver Memorial Skatepark Renovation
Renovation
Post-Bid
Fairbanks, AK 99701

Chena Lake Recreation Area Access Improvements Phase 11B
Renovation
Results
$225,684 est. value
Fairbanks, AK 99707

Student Recreation Center (SRC) Basketball Hoop Replacements
Renovation
Post-Bid
Fairbanks, AK 99775

Baranof Park Improvements
Renovation
Results
$400,000 est. value
Kodiak, AK

Pioneer Park Restroom Replacement
New Construction
Post-Bid
Fairbanks, AK 99701

Suntaheen Fish Pass Interpretive Site Replacement
Renovation
Design
$100,000 to $250,000 est. value
Hoonah, AK

Growden Field Upgrades
Renovation
Results
$250,000 to $1,000,000 est. value
Fairbanks, AK 99701

Russian River Campground, Phase 2
Renovation
Bidding
$7,000,000 to $10,000,000 est. value
Cooper Landing, AK 99572

Last Updated 06/13/2022 04:03 PM
Project Title

Districtwide Playground Equipment and Surface Upgrades - Ketchikan School District

Physical Address View project details and contacts
City, State (County) Ketchikan, AK   (Ketchikan Gateway County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a mixed-use development in Ketchikan, Alaska. Conceptual plans call for site work for a playground / park / athletic field. This would replace and install playground equipment and soft-surface at two school locations. Valley Park and Point Higgins have old wooden playground equipment that would be replaced. As of June 10, 2022, this project is included in the Ketchikan Gateway Borough School District’s FY 2024 - 2030 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents