Similar Projects
2018 Bond Year 3, Contract 9
Bidding
Fort Worth, TX 76112

RM2871 - Resurface Roadway
Bidding
$1,021,821 est. value
TX

1400-1500 Blks Byrd Drive, Street Improvements
Post-Bid
Less than $256,970 est. value
Fort Worth, TX 76114

CIP Improvements Hackamore Street – Sewer, Water & Paving Replacement
Post-Bid
$600,000 est. value
White Settlement, TX 76108

Southern Region Disaster Recovery Support BPA
Results

Parker Henderson Road from Mansfield Highway (BUS.287) to Kellis Street
Results
Fort Worth, TX 76102

2020 Street Mill, Overlay at Various Locations
Post-Bid
Bedford, TX 76021

Rehabilitation of Existing Road
Results
Less than $339,106 est. value
TX

Concrete and Asphalt Repair Services
Term Contract
Post-Bid
Arlington, TX 76019

2020 Brick Pavement Rehabilitation at Various Locations
Results
Fort Worth, TX 76102

FY2019 CIP Improvements Tumbleweed Trail Sewer, Water and Paving Replacement
Post-Bid
Less than $1,800,000 est. value
White Settlement, TX 76108

2020 Concrete Restoration Contract 2 at Various Locations
Results
Fort Worth, TX 76102

Asa Low Intermediate School Access Driveway
Post-Bid
$400,000 to $500,000 est. value
Mansfield, TX 76063

Construct New Roadway Lanes
Results
Less than $24,495,819 est. value
TX

Somerset Phase 3 Paving Improvements
Post-Bid
Mansfield, TX 76063

Last Updated 12/16/2019 10:25 AM
Project Title

Sewer Line & Paving Improvements Clifford Street – East End

Physical Address View project details and contacts
City, State (County) White Settlement, TX 76108   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,474,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 5,100 LF of Sanitary Sewer Line Replacement and approximately 21,600 SY of Paving Replacement. This project begins from the West side of the Bolliger Boulevard and Wagnon Street intersection in a Northwesterly direction in an abandoned Railroad Right of Way, crossing Harwell Street to the center lane of Clifford Rd. Then heading West on Clifford Street and ending at Russell Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents