Similar Projects
Vulture Mountain Recreation Area
Infrastructure, Alteration
Bidding
Wickenburg, AZ 85390

Bridge Deck Replacement
New Construction, Infrastructure
Bidding
AZ

T2 RBDC Bridge
New Construction
Post-Bid
Glendale, AZ 85355

Reconstruction of Court House Pedestrian Bridge
Post-Bid
Bisbee, AZ

Baker Canyon Low-Water Crossing
Results
Safford, AZ

Rio Salado Shared Use Path - Mcclintock Drive Bridge Underpass
Results
$931,949 est. value
Tempe, AZ

System Preservation (Minor Bridge Rehabilitation)
New Construction, Infrastructure
Bidding
AZ

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Flagstaff-Hollbrook Highway Little Colorado River Bridge
Results
$1,500,000 est. value
Phoenix, AZ

AZ FS 24(1) Buffalo Crossing Bridge
New Construction
Post-Bid
Duncan, AZ

Bridge Deck Replacement
Results
Less than $1,900,000 est. value
Tuba City, AZ

Bridge Replacement
Results
Less than $98,000,000 est. value
AZ

Construct Bridge Rehabilitation
Results
Less than $2,500,000 est. value
AZ

Bridge Deck Replacement
Results
Less than $2,200,000 est. value
Nogales, AZ 85600

Tyson Wash Bridge
Results
$9,374,165 est. value
Parker, AZ

Reported 11/10/2021 03:21 PM
Project Title

Construction Manager at Risk for 22nd Street Bridge at Union Pacific Railroad

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $55,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction manager/general contractor to provide design phase assistance and complete construction services as the Construction Manager at Risk (CMAR) for the demolition of the existing bridge and construction of a new bridge at 22nd Street at the Union Pacific Rail Road. A. Pre-construction Phase Services by the CMAR may include the following: 1. Team building/partnering. 2. Management plans. 3. Value analysis/engineering. 4. Design/Constructability reviews. 5. Cost Model/Budget. 6. Schedules Reviews. 7. Estimating/Price/GMP. 8. Bid package strategy (subcontracting, SBE compliance). 9. Ordering of long lead-time materials. B. Construction Phase Services by the CMAR may include the following: 1. Team management/coordination. 2. Critical Path Scheduling. 3. Meeting minutes during design and construction. 4. Processing submittals. 5. Cost controls/change order management. 6. Subcontracting. 7. Field management. 8. Safety/QC programs. 9. Project close out/warranty period services.

Details

Bridge, Addition.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents