Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

SFSR Overlay and Chip Seal project on the Payette National Forest
Alteration
Design
$1,000,000 to $5,000,000 est. value
McCall, ID 83638

New Office/Conference Room Sp, Maintenance/Weld Shops, Idaho State University, Pocatello
New Construction, Infrastructure
Design
$1,025,000 CJ est. value
Pocatello, ID 83209

RFQ Construction Manager - Construction Manager/General Contractor Services - Automotive/Agricultural Diesel Mechanics Facility
New Construction, Infrastructure - 40,000 SF
Bidding
$15,000,000 CJ est. value
Twin Falls, ID 83301

Silver Valley Road Safety Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Silverton, ID 83867

For the Work of Performing Preventative Pavement Maintenance on All State Roads in Power County
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
ID

Warranty Double Chip Seal Coat
Infrastructure
Post-Bid
Lewiston, ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Results
ID

Fairview Avenue Multi Family Residential
New Construction, Infrastructure
Pending Verification
$63,000,000 CJ est. value
Boise, ID 83702

Lava Ridge Wind Project
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Shoshone, ID 83352

Wildwood Street Bridge #1425, 0.1 miles N/O Fairview Avenue - Ada County Highway District
New Construction, Infrastructure
Conception
$434,000 CJ est. value
Boise, ID 83713

Anderson Ranch Turbine Modernization and Runner Replacement
Infrastructure
Design
$20,000,000 CJ est. value
Mountain Home, ID 83647

Bayview Water and Sewer District (BWSD) - Phase 1 - Water System Improvements
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Bayview, ID 83803

Last Updated 09/16/2022 12:32 AM
Project Title

Fish Lake Complex-Phase 1-Doctor Creek Project

Physical Address View project details and contacts
City, State (County) Salmon, ID 83467   (Lemhi County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,128,637 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 08, 2022 Contract Award Number: 1240LT22C0067 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FFA7V36WCYD5 Contractor Awarded Name: HARWARD & REES Contractor Awarded Address: Loa, UT 84747 USA Base and All Options Value (Total Contract Value): $2128637.00 The estimated price range of the project is between $1,000,000 and $5,000,000. Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference. Questions will be considered at any time prior to or during the conference; however, offerors will be asked to confirm verbal questions in writing. Subsequent to the conference, an amendment to the solicitation containing an abstract of the questions and answers, and a list of attendees, will be disseminated. FISH LAKE RECREATION COMPLEX PHASE 1 - DOCTOR CREEK FISHLAKE NATIONAL FOREST FREMONT DISTRICT Delivery: 07/28/2023 Delivery Location Code: 8470 USDA FOREST SERVICE FREMONT RIVER RANGER DISTRICT 138 SOUTH MAIN PO BOX 129 LOA UT 84747-0129 US 0001 Fish Lake Complex-Phase 1-Doctor Creek Project . **amendment 01 ** Amendment 01 posted august 3, 2022 posts attendance roster and site visit summary notes. The due date and time for receipt of proposals is extended. All proposals in response to the solicitation shall be emailed to kellie.Shaw@usda.Gov no later than 1300 mdt, august 12, 2022. Proposals received after the stated due date and time will not be considered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents