Similar Projects
Reported | 10/26/2021 12:00 AM |
Project Title | Frank Holten State Recreation Area (SRA) Basketball Courts and Lighting Improvements |
Physical Address | View project details and contacts |
City, State (County) | East Saint Louis, IL 62205 (Saint Clair County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Completion Expected December 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SCOPE OF WORK: The North Court Basketball Court includes the installation two (2) new playground basketball systems -- hot dipped galvanized steel posts with bent gooseneck style post with 6’-0” safety area and 42” x 72” steel rectangular backboards with 18” double 5/8” steel rims, and nylon nets. The South Basketball Court shall have two (2) existing posts stripped, sanded, cleaned, and painted with black pain, and two (2) new 42” x 60” steel rectangular backboards installed with 18” double 5/8” steel rims, and nylon nets (see Attachment F – Basketball Court Layout). Both the new North Basketball Court and the revitalized South Basketball Court shall receive new striping with white paint compliant with ISHA striping standards (see Attachment F – Basketball Court Layout). Both the North and South Basketball Courts shall be improved with solar lighting – four (4) new LED fixtures at each location shall be mounted on 25’-0” aluminum poles installed per Manufacturer’s Specifications. Along with improvements to the North and South Basketball Courts, each existing aggregate parking lot shall be improved with accessible parking stalls – National Standards for Accessible Design and Illinois Accessibility code compliant 20’-0” x 20’-0” concrete parking stalls (along with appropriate painted markings and signage) and a 5’-0” accessible concrete path connecting to both the North and South Basketball courts. Both sites shall be graded to ensure positive drainage with stormwater directed away from the newly installed North Basketball Court, revitalized South Basketball Court, accessible sidewalks, accessible parking stalls, and improved aggregate parking areas. Turf stand restoration is not included in this project (seeding shall be installed by Site Staff). See Project Specifications & Requirements below for additional information on this project. |
||||||||
Details | Park/Playground, Renovation.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |