Similar Projects
7896 - Robinson - Youell to Plymouth - Water Replacement - TEMP20086 - City of Grand Rapids
Infrastructure
Conception
$750,000 est. value
East Grand Rapids, MI 49506

Robinson Road - Youell to 150 East of Woodmere - TEMP23041 - City of Grand Rapids
Alteration
Conception
$950,000 est. value
Grand Rapids, MI 49506

Prestige Home Group - Parking Lot
Addition
Design
Byron Center, MI 49315

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

Lockdale Pump Station Rehabilitation
Infrastructure
Bidding
$325,000 CJ est. value
Southfield, MI 48034

US-31 Water Main Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Traverse City, MI 49686

Swan Valley School District - HS Athletic Facility - Bid Package 1D
Demolition, New Construction, Renovation, Infrastructure
Sub-Bidding
$750,000 CJ est. value
Saginaw, MI 48601

Augusta Bunton Pump Force Main
Post-Bid
$650,000 est. value
Willis, MI 48191

Columbiaville Elementary Site Work
Post-Bid
Less than $86,000 est. value
Columbiaville, MI 48421

Colfax Avenue & Messner Drive, Napier Avenue to Eloise Drive
Results
Benton Harbor, MI

Water Main and Sewer Project
Results
Hillsdale, MI 49242

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

La Salette Multi-Family Development - The Ivy
Infrastructure, Renovation - 22,923 SF
Pending Verification
$5,000,000 CJ est. value
Berkley, MI 48072

2522 - Cascade/Kentwood Sanitary Trunk Sewer - TEMP18002 - City of Grand Rapids
Alteration
Conception
Grand Rapids, MI

Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Last Updated 09/21/2022 08:44 AM
Project Title

White Elephant Detention Basin Improvement Phase 2

Physical Address View project details and contacts
City, State (County) Sturgis, MI 49091   (Saint Joseph County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $530,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: White Elephant Detention Basin Improvements Phase 2. The White Elephant Detention Basin is a regional stormwater detention basin that collects stormwater from the east and central portions of the City of Sturgis. The project is intended to improve the storage capacity and overall performance of the basin. The Phase 2 expansion builds on the initial expansion completed in 2014. The White Elephant Detention Basin Improvements Phase 2 project consists of the following major items of work: temporary dewatering to access the existing detention basin bottom; excavation of the detention basin expansion on the north side of Fawn River Road; placement of excavated material to form a low-flow channel in the bottom of the basin; excavation of the detention basin expansion on the south side of Fawn River Road; stockpile excavated material onsite; and installation of a culvert under Fawn River Road White Elephant Detention Basin Improvement Phase 2

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents